Similar Projects
Site work for a golf course in Laurel, Maryland.
Infrastructure
Conception
$831,000 CJ est. value
Longview, WA 98632

46th Avenue Construction - City of Longview
Demolition, New Construction, Infrastructure
Conception
$3,650,000 CJ est. value
Longview, WA 98632

SR 504/N Fork Toutle River Kid Valley Bridge - Repair Girders
Infrastructure, Renovation
Design
$2,361,000 CJ est. value
Toutle, WA 98649

I-5/SB Toutle River Bridge - Painting
Renovation, Infrastructure
Design
$4,085,000 CJ est. value
Castle Rock, WA 98611

Pump Station Replacement
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Longview, WA 98632

OLD PACIFIC HIGHWAY OVERLAY SOUTH CITY LIMITS TO 1950 NORTH
Infrastructure
Bidding
$540,000 CJ est. value
Kelso, WA 98626

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

Stewart Field New Restroom Building
New Construction, Infrastructure - 2,385 SF
Post-Bid
Aberdeen, WA 98520

West Scott Avenue and Davidson Avenue BNSF Water Main Crossings
Infrastructure
Results
$850,000 est. value
Woodland, WA 98674

Lower Columbia College - Water Line Replacement - Vancouver
Infrastructure
Results
$72,000 CJ est. value
Longview, WA 98632

Beech Street to Baltimore Water Main Replacements - City of Longview
Infrastructure
Conception
$350,000 est. value
Longview, WA

Beacon Hill Reservoir
Infrastructure
Design
$300,000 CJ est. value
Kelso, WA 98626

Huntington Middle School Safe Routes to School
Infrastructure
Bidding
$450,000 CJ est. value
Kelso, WA 98626

Kelso High School Practice Field Improvements
Infrastructure
Post-Bid
$320,000 CJ est. value
Kelso, WA 98626

California Way Rehabilitation
Infrastructure
Results
$300,000 est. value
Longview, WA 98632

Last Updated 03/08/2023 06:06 AM
Project Title

North Kelso-Pacific-Redpath to Dirk - W-10 - City of Kelso

Physical Address View project details and contacts
City, State (County) Kelso, WA 98626   (Cowlitz County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project completes the replacement of existing 4-inch and 6-inch AC water main with approximately 1,800 linear feet of 12-inch transmission main along N. Pacific Ave. from Redpath St. to Barnes St. Location: N. Pacific Ave. between Redpath St. and Dirk Lane. As of January 6, 2021 no new CIP issued, this project is currently in the FY 2019-2024 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2024. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents