Similar Projects
Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Garfield/22nd Bridge Improvement - City Of Decatur
Infrastructure
Conception
$1,100,000 CJ est. value
Decatur, IL 62526

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

Millikin University Student-Athlete Facility
New Construction, Infrastructure, Renovation - 10,870 SF
Design
$6,700,000 CJ est. value
Decatur, IL 62522

Fermentation Reactor Pilot Project
Infrastructure
Bidding
$225,000 CJ est. value
Decatur, IL 62523

Repair, Pave, and Striping of the Maroa-Forsyth Grade School Parking Lots
Infrastructure, Renovation
Bidding
$325,000 CJ est. value
Decatur, IL 62523

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

2.9 Miles of Patching on Il 48 From 0.1 Miles North Of i-72 to Pershing Road in Decatur.
Infrastructure
Results
Decatur, IL

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

A-O Grade School Pavement Rehabilitation
Infrastructure
Construction
$333,852 CJ est. value
Oreana, IL 62554

HSHS St. Mary's Hospital Renovation
Addition, Renovation, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Decatur, IL 62521

Decatur Raw Water Pipeline From Sludge Lagoon - City of Decatur
Infrastructure
Conception
$960,000 CJ est. value
Decatur, IL 62523

Various City, County, Township, and Village Streets
Infrastructure
Post-Bid
$198,000 est. value
Decatur, IL

Last Updated 05/09/2023 02:34 AM
Project Title

Bridge Bearing Replacement on SN058-0084 and SN 058-0085 on IL 48

Physical Address View project details and contacts
City, State (County) Decatur, IL 62526   (Macon County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $487,391 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge bearing replacement on SN058-0084 and SN 058-0085 on IL 48 approximately 2.5 miles east of Forsyth. Region 4 District 7 Federal Project # NHPPZZSV(089) County(s) Macon Key Route(s) FAI 72 Marked Route(s) I-72 Section(s) D7 BRIDGE REPAIRS 2023-7 State Job #(s) C-97-080-22 PPS #(s) 7-52871-0000 Completion Date: 35 Working Days Questions not accepted as of February 28, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void, or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, February 17, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 025 - Bridge Bearing Replacement on SN058-0084 and SN 058-0085 on IL 48

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents