Similar Projects
Last Updated | 02/19/2024 09:10 AM |
Project Title | 2023 Stemflex Building Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Heath, OH 43056 (Licking County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Construction Nearing Completion, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $1,288,310 [brand] Estimate |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of February 19, 2024, construction of this project has commenced and is nearing completion, however, an exact timeline for construction has not been confirmed. This project involves the redevelopment of two buildings located at 1401 & 1425 Mt. Vernon Road, Newark. This project will include limited demolition, building structural repairs, skylight replacements, lighting upgrades, HVAC replacement & addition, plumbing repairs & replacement, flooring repair & replacement, drop ceiling replacement, store front glass replacement and painting per the redevelopment plans. 1401 Mt. Vernon Road, Newark. This project consists of renovation of a 8,470 square foot, 1 story pre-engineered metal building structure, and slab on grade. The purpose of the building is for future industrial/office tenant fit-out the building has a 3,158 SF office area. The building is not sprinklered. Interior will be heated with new equipment. 1425 Mt. Vernon Road, Newark. This project consists of renovation of a 16532 square foot, 1 story with mezzanine pre-engineered metal building structure, and slab on grade. The purpose of the building is for future industrial/office tenant fit-out the building has a 5,888 SF office area. The building is not sprinklered. Interior will be heated with existing and new equipment. 2023 stemflex building improvement project2023 stemflex building improvement project2023 stemflex building improvement project. A bid bond for 100% of the bid amount or a certified check on a solvent bank for 10% of the bid amount must accompany bid. If bid is accepted, a contract will be entered into with a required performance bond in the amount of no less than 100% of the contract price. Bond returns conditional upon the faithful performance of the contract. |
||
Details | 1 Story Above Grade, 25,002 SF.
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |