Similar Projects
Last Updated | 03/10/2021 02:16 PM |
Project Title | Great Connection Bike Path (Phase 7 - Verity to Water Connector) |
Physical Address | View project details and contacts |
City, State (County) | Middletown, OH (Butler County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work will consist of updating, widening, and connecting an existing asphalt bike path along Verity Parkway to the proposed bike path near Water St. Total project length is approximately 2 miles and includes asphalt resurfacing, pavement marking, concrete curb replacement, and curb ramp construction. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |