Similar Projects
Philmnt/Tomlinson/Pine Rd Int
Infrastructure
Conception
$24,196,000 CJ est. value
Lower Moreland Township, PA 19006

Philmnt/Tomlinson/Pine Rd Int
Infrastructure
Conception
$24,196,000 CJ est. value
Lower Moreland Township, PA 19006

AutoZone #5334 / Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

AutoZone #5334 / Norristown
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
East Norriton, PA 19401

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

Norm Westbrook Park Phase 1 Construction
Infrastructure
Post-Bid
$250,000 CJ est. value
Ocala, FL 34482

State Game Lands #183 Shooting Range Improvements
Results
Palmyra, PA

Salem Township Watts and Walker Road Improvements
Results
Wayne, PA

Mancill Mill Road Apartments
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
King of Prussia, PA 19406

Bala and Highland Avenue Multi Residential
New Construction, Infrastructure - 2,650 SF
Pending Verification
$7,500,000 CJ est. value
Bala Cynwyd, PA 19004

District Wide Bridge Rehab Group P
Infrastructure, Renovation
Conception
$8,358,000 CJ est. value
Schwenksville, PA 19473

N Narberth Avenue O/AMTRAK
Demolition, New Construction, Infrastructure
Design
$10,747,000 CJ est. value
Narberth, PA 19072

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Chesapeake Bay Watershed Pollution Reduction
Infrastructure
Results

Belfair Square
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Towamencin Township, PA 19446

Last Updated 05/02/2023 01:48 PM
Project Title

Williamson Road Culvert

Physical Address View project details and contacts
City, State (County) Lower Merion Township, PA 19035   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $170,270 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Sealed proposals will be received by the township of lower merion for the following: williamson road culvert contract number: 4237-22-17 Each proposal shall be accompanied by a bid guaranty as specified in the instructions to bidders section of the bid document. A performance bond and labor and materials bond in the amount of 100% are required. Also, a maintenance bond in the amount of 25% is required Scope of work the work includes, but is not limited to, maintenance and protection of traffic; temporary erosion and sediment control measures; temporary stream diversion; and site restoration; repair and modification of headwall; and discharge headwall construction, and riprap for option a, the work includes, but is not limited to, traditional pipe replacement of the existing culvert with full excavation; paving and curb removal and restoration; guiderail removal and restoration. For option b, the work includes, but is not limited to, slip lining and grouting of the existing culvert, discharge headwall, and riprap. 9. Detailed specifications developed by the pennoni associates, inc. Questions regarding the project scope shall be submitted Attention is called to the fact that not less than the minimum salaries and wages as set forth in the contract documents must be paid on this project, and that the contractor must ensure that employees and applicants for the employment are not discriminated against because of their, race, color, religious creed, ancestry, age, sex, national origin, physical or mental disability, or because of a personaeur(tm)s sexual orientation, gender identity or gender expression. The board of commissioners reserves the right to reject any or all bids or parts thereof or to waive any informality or irregularity as deemed to the best interest of the township CLARIFICATION DEADLINE 6/10/2022 4:30 PM

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents