Similar Projects
2021 CDBG Wastewater Improvements
Renovation
Design
$6,000,000 CJ est. value
Morton, MS 39117

2021 CDBG Wastewater Improvements Project
Renovation
Bidding
$3,000,000 CJ est. value
Morton, MS 39117

Wastewater Treatment Facility (WWTF) Improvements Phase II
Renovation
Bidding
$300,000 CJ est. value
Saltillo, MS 38866

South Gulfport WWTP Clam Hoist
Post-Bid
Gulfport, MS 39503

Sewerage Pre-Treatment System
New Construction
Post-Bid
Meridian, MS

Metro Wastewater Treatment Plant Improvements
Renovation
Results
$10,631,000 est. value
Hernando, MS

Wastewater Treatment Upgrades - Boswell Regional Center
Renovation
Results
Magee, MS 39111

Utility Extension & Treatment Plant Expansion - HLRA - 11
Renovation, Infrastructure
Post-Bid
$250,000 est. value
Moselle, MS

Wastewater Improvements at Hugh White State Park
Infrastructure
Results
Grenada, MS 38902

Wastewater Treatment Improvements
Renovation
Post-Bid
$200,000 CJ est. value
Tutwiler, MS 38963

Wastewater Treatment Facilities and Collection System Improvements
Renovation
Results
Marietta, MS

Sewage Treatment Plant Improvements
Renovation
Post-Bid
$325,000 est. value
Crowder, MS

Wastewater Facilities Improvements
Renovation
Results
Marks, MS

Durant CDBG 2021, Wastewater System Improvements
Infrastructure
Post-Bid
$3,000,000 est. value
Durant, MS

2021 Wastewater Treatment Plant Improvements, Phase 2
Renovation
Results
Cleveland, MS

Last Updated 09/07/2022 07:01 AM
Project Title

Harrison County Utility Authority

Physical Address View project details and contacts
City, State (County) Gulfport, MS 39501   (Harrison County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Notice is hereby given that the Executive Director of the Harrison County Utility Authority will receive sealed bids until at the Utility Authority Office located at 10271 Express Drive, Gulfport, MS 39503, for furnishing chlorine and sulfur dioxide gas, for use at our Wastewater Treatment Facilities and Water Well Facilities. Electronic bid submissions are required. The term of the Contract will be for one (1) year, beginning November 1, 2022, with 2 additional yearly extensions. Terms are to be agreeable to both parties, for each annual extension. Bidders will submit their bids on the form provided in the bid specification package by the Utility Authority. Failure to do so will disqualify the bidder. Bid forms including specifications and other details must be obtained through the Central Bidding

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents