Similar Projects
Kootenai Bunco Road Improvements
Term Contract
Design
Athol, ID 83801

Constructing a New Eastbound Port of Entry (Poe) Facility on I-84 at MP 219 and Removing the Existing Cotterel POE
Infrastructure
Bidding
$10,000,000 to $15,000,000 est. value
ID

Constructing a Sealcoat on Sh-21, Mp 72.725 To 93.85
Infrastructure
Bidding
ID

Construction Services for Cleanup of Upper Basin of the Bunker Hill Mining and Metallurgical Complex Superfund Site
Infrastructure, Alteration
Post-Bid
ID

I-86/I-15 Sys IC Reconstruction Pre Advertisement Presentation
Infrastructure
Post-Bid
ID

Spruce Street Road Maintenance Project
Infrastructure
Results
Less than $200,000 est. value
Sandpoint, ID 83809

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Kathleen Avenue Improvements
Infrastructure
Bidding
Coeur d'Alene, ID 83815

Culdesac Canyon Passing Lane, PH 3
Infrastructure
Post-Bid
$10,000,000 to $15,000,000 est. value

DIJ Construct Taxilane
Infrastructure, Alteration
Results
$1,255,580 est. value
Driggs, ID 83422

For the Work of, Performing A 0.20 Mill And 0.30 Overlay Superpave Hma On Sh-34 Between Mp 59.25 to Mp 63.5
Infrastructure
Bidding
ID

Runway 2/20 Pavement Maintenance at Sandpoint Airport
Infrastructure
Results
Sandpoint, ID 83864

Cold Milling, Smoothness Milling, Crack Filling Placement of Plant Mix Pavement, Guardrail and Sign Update Between MP 23.60 and MP 29.00 on SH-3
Infrastructure
Bidding
ID

Widening US-95 from MP 471.33 to 471.75 to add both southbound and northbound acceleration lanes
Infrastructure
Results
ID

Performing A Thin 0.10` Mill and Lay of 0.15 Superpave HMA on Sh-34 Between MP 83.975 to MP 89.867
Infrastructure
Bidding
ID

Last Updated 12/23/2021 12:34 AM
Project Title

Capital Maintenance, Phase 3, ACHD, Boise Area

Physical Address View project details and contacts
City, State (County) ID   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement rehabilitation and upgrade of adjacent pedestrian ramps on 8th Street, from Pine Avenue to Cherry Lane

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents