Similar Projects
Last Updated | 06/24/2020 10:53 AM |
Project Title | Construction of Bridges at Louetta Road and Little Cypress Creek from Stablewood Farms Drive to Telge Road |
Physical Address | View project details and contacts |
City, State (County) | Houston, TX 77002 (Harris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of approximately 4,700 feet and spans over Precincts 3 and 4. The precinct divide is Little Cypress Creek located about midway through the project with Precinct 3 to the west and Precinct 4 to the east. Currently, the project alignment is undeveloped and forested within the project limits. Stablewood Farms subdivision exists on both sides of proposed Louetta Road on the Precinct 3 side. Stable Gate subdivision is along the north side of Louetta Road in Precinct 4 with the Reserve at Cypress Creek on the south side per the specifications. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |