Similar Projects
I-5, Mounts Rd To Steilacoom-Dupont Rd - Corridor Improvements
Infrastructure
Bidding
$165,000,000 to $195,000,000 est. value
WA

2022 Annual Pavement Maintenance and Repair
Infrastructure
Bidding
Gig Harbor, WA

ASOG Complex
New Construction, Infrastructure - 71,600 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Camp Murray, WA

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SR 167,I-5 to SR 509 - New Expressway
Infrastructure
Results
$325,000,000 to $375,000,000 est. value
WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Puyallup Avenue Transit - Street Improvements
Infrastructure
Results
$100,000 est. value
Tacoma, WA

Town Center - Utility and Woonerf Project
Infrastructure
Post-Bid
$5,000,000 to $6,100,000 est. value
Sumner, WA

Right Abutment Access Road Remidiation
Alteration
Results
$100,000 to $120,000 est. value
Shelton, Tacoma, WA

SR 161 / Washington Avenue North Corridor Streetscape Phase 2
Infrastructure
Post-Bid
$2,300,000 to $2,500,000 est. value
Eatonville, WA 98328

Transfer Lead Upgrades
Infrastructure
Results
$251,000 est. value
WA

92nd Avenue East/224th Street East
Alteration
Results
$2,700,000 to $4,000,000 est. value
WA

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

CRP 5736 Canyon Road East - 400 ft. n/o of 84th St E to 72nd Street East
Infrastructure
Results
$6,000,000 to $8,000,000 est. value
Tacoma, WA 98417

Reported 05/27/2022 12:00 AM
Project Title

PCT Operational Pavement Repair 2022

Physical Address View project details and contacts
City, State (County) Tacoma, WA   (Pierce County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Work required for this Project includes: Milling and replacement of failed asphalt sections throughout the container yard. Milling will be completed by mechanical mills to a depth of 4-1/2" with replacement pavement placed in to lifts and finished to match adjacent paved areas. A second potential component of the work includes the placement of concrete collars around utility basin lids. This effort will include sawcutting and removal of the existing asphalt pavement, placement of rebar and concrete in accordance with the specifications.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents