Similar Projects
WY Nps 2017(1) Moose Wilson Road Phase 1
Term Contract
Design
Jackson, Teton Village, WY 83001

Burgess Road (Nfsr #15) Road Improvements
Term Contract
Design
Sheridan, WY 82801

Rancher Complete Street Project
Infrastructure
Bidding
Jackson, WY 83001

Bituminous Pavement Surfacing(Recycle)
Infrastructure
Bidding
WY

WY Flap 407(1) Kortes Road
Term Contract
Post-Bid
Alcova, WY

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

The Construction of 2021 Fall Street Patching Project
Infrastructure
Results
Jackson, WY 83002

Bar Nunn Asphalt Improvements - Phase II
Alteration
Results
$293,832 est. value
Bar Nunn, WY

Crazy Woman Road Improvement Project
Term Contract
Design
$500,000 to $1,000,000 est. value
Buffalo, WY

Bituminous Pavement Surfacing
Infrastructure
Bidding
WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

Casper - Kaycee (Horse Ranch Creek South)
Infrastructure
Results
Casper, Kaycee, WY

Bituminous Pavement Surfacing
Infrastructure
Bidding
WY

Milling Plant Mix, Bituminous Pavement Surfacing, Chip Seal and Miscellaneous Work
Infrastructure
Post-Bid
WY

District 3 Bridge Rehabilitation
Infrastructure
Results
WY

Reported 01/27/2022 12:00 AM
Project Title

WY Flap 740(1) Skyline Drive & Fremont Lake Road

Physical Address View project details and contacts
City, State (County) Pinedale, WY 82941   (Sublette County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCHEDULE A Skyline Drive: The existing Skyline Drive is a two-lane paved roadway with varying widths and variable width unpaved shoulders, as well as multiple paved and unpaved pull-offs and intersecting roadways. Roadway shoulder widths are typically narrow or non-existent. The roadway surface is showing signs of deterioration including thermal and block cracking with some areas showing signs of fatigue cracking. The speed limit on the route is currently not posted. The entire 4.3 miles is in steep mountainous terrain with narrow roadway bench widths along the majority of the route. There are two parking areas with trail access at the end of the route. Daily traffic is approximately 1000. The proposed road improvements include pulverizing and paving, minor widening, grading, and drainage improvements to 4.3 miles of Skyline Drive. Option X Fremont Lake Road: The existing Lower Fremont Lake Road (FS 111) is a two-lane gravel roadway with varying widths, unpaved pull-offs and intersecting roadway, public parking lots to access Fremont Lake recreation, driveways to private properties, and a private lodging. Roadway shoulder widths are typically narrow or non-existent. The gravel roadway surface is showing signs of deterioration including wash boarding and rutting. The speed limit on the route is currently not posted. The entire 1.47 miles is in rolling terrain. There is a parking area with boat ramp to access the lake at the end of the route. Daily traffic is approximately 500.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents