Similar Projects
FY2022-23 Woodcreek Golf Facility Renovations and Restoration - 500297 - City of Roseville
Alteration
Conception
$800,000 est. value
Roseville, CA 95747

Stoneridge Parcel 58 Bike Trail - Miner's Ravine to Orvietto Drive - 500262 - City of Roseville
Infrastructure
Conception
$2,330,000 est. value
Roseville, CA 95678

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Sunset Whitney Recreation Area East Pathway Phase II Project
Infrastructure
Bidding
$200,000 est. value
Rocklin, CA 95677

Hydrant and Valve Maintenance
Term Contract
Post-Bid
Granite Bay, CA

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

County of Placer - 2021 Roadway Surface Treatments
Alteration
Results
CA

2021 Roadway Hot Mix Asphalt Overlay Project
Infrastructure
Results
$1,700,000 est. value
CA

Eureka Road Pipeline Replacement
Infrastructure
Post-Bid
$2,540,000 est. value
Granite Bay, CA 95746

Wastewater, Water, And Landfill Systems Consulting Services
Infrastructure
Results
CA

Paving and Striping Services
Infrastructure
Post-Bid
Roseville, CA

Realign Roadway, Construct Roundabout and Relocate Sewer Lines
Infrastructure
Results
$4,220,000 est. value
CA

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Replacement of Asphalt Concrete in Various Locations
Infrastructure
Results
Tahoe Vista, CA

2022 Patch Paving
Infrastructure
Post-Bid
$700,000 est. value
Tahoe City, CA

Last Updated 07/04/2022 03:21 AM
Project Title

2022 Road Reconstruction Project

Physical Address View project details and contacts
City, State (County) Truckee, CA 96161   (Placer County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes total reconstruction utilizing pulverization of approximately 541,585 square-ft of existing asphaltic concrete roadway as well as restoration of surface utilities, installation of new water valves, replacement of galvanized water lines, and installation of AC dike. Work is to be performed on Basque Drive, Skidder Trail, Lodgepole, Wolf Tree, White Fir, Conifer, Bitter Brush, and Whistle Punk Roads in Truckee, CA.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents