Similar Projects
North Smoky Hills Graveling
Renovation
Post-Bid

Concrete; Paving, Slabs and Repair
Infrastructure
Post-Bid
$50,000 to $150,000 est. value

Seal Coat Improvements
Results
$200,000 to $250,000 est. value
Redwood Falls, MN

CSAH 1 and 101 Overlays
Results
$4,307,079 est. value
Redwood Falls, MN

CSAH 1 Seal Coat Rural
Infrastructure
Post-Bid
MN

Bituminous Seal Coat on Various Roads and Parking Lots
Results
$1,078,723 est. value
MN

Power Plant Road Stabilization
Infrastructure
Results
Redwood Falls, MN

Grading and Concrete Culverts
Infrastructure
Results
$348,150 est. value
MN

Seal Bituminous Pavement Cracks and Crack Sealing
Infrastructure
Results

Mill and Overlay, Cold in Place Recycle, Lighting, Pedestrian Crosswalk Flasher System, Snow Fence, and ADA Improvements 8.423 Miles
Infrastructure
Results

Full Depth Reclamation, Bituminous Overlay, Aggregate Shoulders, and Striping
Infrastructure
Results
MN

Grading, Bituminous Surfacing, Retaining Walls, Noise Walls, Ada Improvements, Signals, Lighting, Tms and Bridge Nos
New Construction, Infrastructure
Results

CSAH 6 CIR, Bituminous Overlay
Infrastructure
Results
$4,672,529 est. value
MN

2022 Drew Street Improvements
Infrastructure
Results
$2,500,000 to $3,000,000 est. value
Redwood Falls, MN 56283

CSAH 1 Reconstruction
Infrastructure
Results
MN

Last Updated 05/26/2022 12:56 AM
Project Title

County Road 63 Improvements

Physical Address View project details and contacts
City, State (County) MN   (Redwood County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

On County Road (CR) 63 (Pine Street/South Street) from 768’ north of the Clements City limits on CR 63 to 14’ south of the CSAH 16 centerline (geographic). From 96’ South of CR 63 & South Street intersection to 14’ south of the north line of section 33T-111-N R-35-W in Three Lakes Township, City of Clements, Redwood County, MN (legal) 1 Mobilization Lump Sum 3687 Excavation – Common (P) Cu Yd 741 Common Embankment (CV) (P) Cu Yd 3411 Aggregate Base Class 5 (CV) (P) Cu Yd 1223 Type SP 12.5 Wearing Course Mix (2;C) Ton 8364 Geotextile Fabric Type 5 Sq Yd 3789 4” Perf TP Pipe Drain Lin Ft 54 6” HDPE Pipe Sewer Lin Ft 0.73 Seeding Acre 2874 Hydraulic Reinforced Fiber Matrix LBS

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents