Similar Projects
Fire Station 23 Storm and Sanitary Sewer Repairs
Infrastructure
Bidding
Cleveland, OH 44102

Tower City Water Mains Replacement
Infrastructure
Bidding
Cleveland, OH

Precast Concrete Headwalls
Post-Bid

Nine Mile Creek Restoration Project
Post-Bid
Bratenahl, OH 44108

Jacking and Boring Services
Term Contract
Results
Akron, Ashland, Bowling Green, Chillicothe, Delaware, Garfield Heights, Jacksontown, Lebanon, Lima, Marietta, New Philadelphia, OH

Selwyn Road Resurfacing and Waterline Replacement
Results
$1,478,691 est. value
Cleveland Heights, OH 44118

Green Road Station, East 159th Loop, West 33 Road Loop Catch Basin Repairs
Infrastructure
Bidding
$36,593 est. value
Cleveland, Shaker Heights, OH 44122

Water Main Renewal Phase 2
Post-Bid
Cleveland, OH

Valves and Appurtenances
Results
Cleveland, OH 44114

South Canterbury Road Culvert Replacement
Infrastructure
Bidding
$195,000 est. value
Parma, OH 44129

Jacking and Boring Services
Post-Bid

Design-Build Services - Beecher's Brook Restoration and Chagrin River Restoration at Jackson Field, North Chagrin and South Chagrin Reservations
Results
Cleveland, OH 44144

Alberta Park Estates Residential Sewer Repairs
Renovation, Infrastructure
Bidding
$173,500 est. value
Lyndhurst, OH

Alternative Liner Pipe Material (CIPP)
Term Contract
Post-Bid

Debris Racks and Access Road Improvements in Various Locations Design/Build
Results
$285,687 est. value
Cleveland, OH 44115

Last Updated 07/22/2021 09:46 AM
Project Title

Streambank Stabilization along Chippewa Creek at Millside Center

Physical Address View project details and contacts
City, State (County) Cleveland, OH   (Cuyahoga County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,546,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

93 LF of soldier pile retaining wall along the northern stream bank. Approximately 142 LF of rock stabilization along the southern stream bank. Extension of approximately 30 LF of 30-inch and 42-inch diameter storm sewer, construction of a new storm sewer manhole, and headwall. Replacement of approximately 355 LF of 12-inch diameter water main.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents