Similar Projects
Cascade Jr/Sr HS New Lift Station and Forcemain
Addition
Bidding
$300,000 est. value
Clayton, IN 46118

Boone Grove High School - New Wastewater Treatment Plant
New Construction
Bidding
$650,000 est. value
Valparaiso, IN 46385

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Cane Run Flood Control Pumping Station 5
Post-Bid
$5,000,000 to $6,000,000 est. value
Jeffersonville, IN

Carriage House Lift Station Rehabilitation
Results
Less than $353,300 est. value
Evansville, IN

Crawfordsville Board of Public Works and Safety Big Four Arch Lift Station
Results
Crawfordsville, IN

Bud Meeks Lift Station Improvements
Renovation
Bidding
$400,000 est. value
Fort Wayne, IN

Wastewater Treatment Plant And Lift Station Upgrade
Post-Bid
Rochester, IN

Wastewater Collection System and Lagoon Improvements Project
Results
Morgantown, IN

Market Survey/Sources Sought for Construction Work at Gary Sanitary District - 27th and Chase Pump Station Force Main Replacement, In Lake County, Gary, Indiana
Post-Bid
Gary, IN

Schoolview Drive Lift Station Improvements
Results
Rochester, IN

Lake Station Crossroads Lift Station Replacement - Section 219
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Junior Warfield Lift Station Drive Replacement
Results
Less than $388,420 est. value
Evansville, IN

Airport Lift Station Rehabilitation
Post-Bid
Sellersburg, IN 47172

LTCP Phase II Improvements
New Construction
Results
IN 46952

Last Updated 05/25/2022 12:26 PM
Project Title

Main Street Regional Lift Station Contract A

Physical Address View project details and contacts
City, State (County) Whitestown, IN   (Boone County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,750,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of construction of a new cast-in-place concrete wetwell and control building. The lift station will include new pumps, piping, valves, controls and electrical improvements. A new on site backup generator and odor control unit are also included in the project.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents