Similar Projects
Royal Caribbean Cruise Terminal
New Construction - 170,000 SF
Design
Galveston, TX 77550

Baggage Make-Up Unit Replacement and Baggage Handling System Improvements
Post-Bid
Killeen, TX 76549

Annual Request for Qualifications for future airport-related planning and development projects
Term Contract
Post-Bid

Airport Improvements
Results
Vernon, TX 76384

Terminal D Board Owned Passenger Boarding Bridge Rehabilitation
Renovation
Results
$4,254,000 est. value
Dallas, TX

American Airlines DFW Central Fulfillment Center
New Construction - 394,000 SF
Construction
$10,000,000 CJ est. value
Dallas, TX 75261

Terminal D SV Mezzanine Base Building Corrections
Renovation
Results
$473,795 est. value
Dallas, TX 75261

New Airport Terminal Building – Refugio County
Results
Less than $381,749 est. value
Refugio, TX 78377

Last Updated 08/04/2020 12:10 PM
Project Title

Terminal A and C Skylink Restroom Improvements

Physical Address View project details and contacts
City, State (County) Dallas, TX 75261   (Dallas County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Terminal A, Gate 29 – approximately 4,000 gsf when complete and includes reconfiguration of the men’s and women’s restrooms. Also requires expansion into the adjacent American Airlines Concierge Key office, of which the office functions and contents will be relocated under a separate contract, but remaining demolition will be associated with this contract. Terminal C, Gate 28 – approximately 6,000 gsf when complete and includes reconfiguration of the men’s and women’s restrooms. Also requires expansion into an adjacent 2-story volume of space currently associated with the American Airlines Gym. The project includes the renovation and conversion of the vacated existing gymnasium beneath Gate C-28 restroom, into a new food service storage area. Within this scope of services, the 2-story space will be modified with a structural concrete slab infill at the concourse elevation to provide the additional floor area required for the restroom expansion.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents