Similar Projects
Boiler Plant Upgrades
Renovation, Alteration
Design
$100,000 to $250,000 est. value
Bath, NY 14810

State Phase II B Boiler Replacement at Bayview Houses
Alteration
Bidding
Brooklyn, NY 11236

State Phase II A Boiler Replacement and Hot Water Heaters at Upaca Site
Term Contract
Bidding
New York, NY 10035

Design/Installation Mezzanine and Installation Scrubber
Post-Bid
Albany, NY 12203

Furnish and Install Piping Insulation
Term Contract
Post-Bid
Syracuse, NY 13202

Boiler Maintenance for Housing Contract
Results
Watervliet, NY

Lansing CSD - Reconstruction to Senior High School - Mechanical
Results
Less than $80,000 est. value
Lansing, NY 14882

State Phase II B Boiler Replacement at Smith Houses
Term Contract
Bidding
New York, NY 10038

Rowley Center for Science and Engineering HVAC Boiler Exhaust Replacement
Post-Bid
Middletown, NY 10940

Building 17 Power Plant Equipment Maintenance, Testing and Repair for Centrifugal Chillers at West Averill Harriman State Office Campus
Term Contract
Results
Albany, NY 12226

Upgrade Electrical and Steam Distribution for New Ship Phase 2
Alteration
Bidding
$1,000,000 to $2,500,000 est. value
Bronx, NY 10465

Gun Tube Heat Treat Furnace Replacement at The Watervliet Arsenal
Post-Bid
$25,000,000 to $100,000,000 est. value
Watervliet, NY 12189

Removal and Replacement of Fire, Flood, and H2S Systems
Results
$100,000 to $250,000 est. value
Dresden, NY 14441

Plumbing Equipment, Supplies, And Mechanical Plumbing Services
Term Contract
Bidding
Jericho, NY

MFCH Secondary DHW System Installation Services
Term Contract
Post-Bid
Valhalla, NY 10595

Reported 02/23/2022 12:00 AM
Project Title

Human Ecology Building Chiller Replacement

Physical Address View project details and contacts
City, State (County) Ithaca, NY 14850   (Tompkins County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Owner
Owner View project details and contacts
Architect View project details and contacts
Description

1. Replacement of the existing “Blue Chill” chiller and associated mechanical and electrical work. The work shall also include enlarging the existing concrete pad and coordinated shutdowns with laboratory users whose research is supported by the equipment. 2. The Contractor is responsible for providing and installing the new chiller.Total sq ft for project not available at this time.

Details

Division 03 - Concrete, Concrete Accessories.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment, Humidity Control Equipment, Mechanical Dehumidification Units.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents