Similar Projects
City Hall Windows - Air Seal Replacements - 563 - City Of La Crosse
Renovation
Conception
$600,000 CJ est. value
La Crosse, WI 54601

City Hall Renovation - 25 FAC CTYHL - City of Oshkosh
Renovation
Conception
$18,000,000 CJ est. value
Oshkosh, WI 54901

Waukesha County Courthouse Project Step 2 - Renovate 1959 Courthouse
Renovation
Design
$58,600,000 est. value
Waukesha, WI 53188

Remodel - 5th Floor - City Hall - City of La Crosse
Build-out
Design
$700,000 CJ est. value
La Crosse, WI 54601

Hammond Town Hall Addition
Addition, Renovation, Infrastructure
Bidding
$310,000 CJ est. value
Hammond, WI 54015

City Hall 1st and 2nd Floor Counter Remodel and Entrance Door Replacement
Build-out, Renovation - 1,718 SF
Bidding
$158,565 CJ est. value
Sun Prairie, WI 53590

City Hall Improvements
Renovation
Post-Bid
Hudson, WI 54016

Manitowoc County Courthouse Restroom Remodel
Renovation
Post-Bid
Manitowoc, WI 54220

Trempealeau County Justice Center - Bid Package 2
New Construction
Results
Whitehall, WI 54773

Door County Highway Department Brine Facility
New Construction - 350 SF
Results
Sturgeon Bay, WI 54235

Downtown Vision
New Construction, Infrastructure
Pending Verification
$539,000,000 CJ est. value
Kenosha, WI 53140

Rusk County Government Center Remodel
Build-out
Design
$5,458,700 CJ est. value
Ladysmith, WI 54848

Public Safety Building
New Construction - 60,000 SF
Post-Bid
$16,300,000 est. value
McFarland, WI

City Hall 2nd and 3rd Floor Security Upgrades
Renovation - 13,600 SF
Results
Beloit, WI 53511

Sawyer County Courthouse BP 2
Renovation, Addition
Post-Bid
Hayward, WI 54843

Last Updated 05/30/2023 06:33 PM
Project Title

911 Dispatch Center - Modernization Project Door County Justice Center

Physical Address View project details and contacts
City, State (County) Sturgeon Bay, WI 54235   (Door County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $111,915 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 05/30/2023 It was awarded to Xybix for a total of $111,914.98. No official start date has been chosen. General conditions are listed below. Contractors are required to review the General conditions at an optional on site meeting. Door County seeks to contract with a qualified contractor for the above project, which includes the removal and modernization of the Counsel Equipment and Interior flooring upgrades located in the Door County Justice Center in Sturgeon Bay, WI. If an intended awardee so executes the agreement and files bonds and insurance as required, the check or bid bond will be returned. In case the intended awardee fails to execute the contract and file bonds and insurance as required by the contract documents, the amount of the check or bid bond submitted with the proposal shall be forfeited as liquidated damages. The contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to perform the work as described herein. All work shall be conducted per this scope of work and all applicable Federal, State, and local laws, regulations, codes and directives. This summary is not all-inclusive and delineates only those work items deemed as major to the contract. Ancillary work items not listed below, though necessary to attain the completed project, shall be included in the contract. Scope of work may not be all encompassing. Qualified Contractors are urged to complete the site visit and make proposals based on the intent of the project which is to modernize the existing system IAW all State and Federal requirements. Prior to the acceptance of work by the County, the Contractor shall arrange, through Facilities and Parks Director or their designee, an inspection of the work site to ensure proper operation, to identify necessary corrective work, and to ensure proper work area cleanup. A. Provide, perform, and complete all labor, services, equipment, and materials necessary to accomplish the project at the work site as set forth in the Request for Proposal, Instructions, Specifications, and Contractor's ____________bid proposal, all of which are attached hereto and incorporated herein by reference as if set forth in full. B. Procure and furnish all permits, licenses, and other governmental approvals and authorizations necessary in connection with the project. C. Procure and furnish all bonds and all certificates and policies of insurance specified in this contract. D. Do all other things required of Contractor by this contract.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents