Reported | 05/05/2021 12:00 AM |
Project Title | Lubbock Cooper ISD High School Addition And Renovation - Lee Lewis Construction |
Physical Address | View project details and contacts |
City, State (County) | Lubbock, TX 79423 (Lubbock County) |
Category(s) | Education |
Sub-Category(s) | Middle/Senior High School |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Construction Manager |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Work of the Project includes constructionof approximatley 64,000 square foot addition to the existing high school campus. A portion of the new construction will be two stories. Work will also include renovations to existing areas within the high school building. 1. Site: All utilities withing the Project site will be provided as part of the Project. Replacement of existing asphalt paving with new asphalt paving with and alternate for concrete paving. Landscaping will include new irrigation and reworking of existing irrigation lines. 2. Structural: Shallow foudations with concrete grade beams will support all vertical construction. No sub-grade structures for the building will be constructed except for elevator related conditions. Floor slab will be 5-inch thick steel reinforced concrete over vapor barrier on grade and over steel deck elevated slabs. Conventional steel structure will comprise the majority of the framing. Load-bearing CMU constructin will be utilized as well. 3. Architecture: Exterior wall assemblies include face brick and aluminum composite metal panels over metal stud and CMU assemblies. Exterior storefront will be used to enclose opening in exterior facades. Aluminum and hollow metal doors and systems will be used thorughout. Roof construction will be structural steeel framing and steel deck covered by rigid insualtion board and coal-tar elastomeric roofing system. Interior system include, but are not limited to, drywall and cmu paritions, ceilings, suspended drywall and acoustical ceilings miscellaneous metals, flexible folding partitions, MRL hydraulic elevator and miscellaneous specialties. 4. Mechanical/Plumbing: HVAC systems will be rooftop units with mini-split units for specialized accessory spaces such as IT closets. Roof drainage will be pipped to exterior walls and internal plumbing will connect wet areas. A wet pipe fire sprinkler system will be provided as part of the new building along with fire sprinkler piping in the existing building as noted on the Drawings. 5. Electrical and Telecommunications: New pad mounted transformer and electrical distribution devices will be provied as part of this project. General illumination will be achieved with LED fixtures. Some specialty lighting is also provided throughout the new addition. |
||||||||||||||||||||||||||||||||||||||
Details | Middle/Senior High School, Addition, 1 Middle/Senior High School, Approximately 64,000 SF Addition.
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |