Similar Projects
Port Of Alaska Utility Locates
Alteration
Post-Bid
Less than $50,000 est. value
Anchorage, AK

Tudor-Wright Water Upgrades
Infrastructure
Results
$761,579 CJ est. value
Anchorage, AK 99501

North Peninsula Recreation Center Touchless Fixture Upgrade
Alteration
Results
Kenai, AK 99611

South Peninsula Hospital (SPH) Domestic Hot Water
Renovation
Post-Bid
$664,200 CJ est. value
Homer, AK 99603

Homer Monofill
Infrastructure
Results
$174,495 CJ est. value
Soldotna, AK 99669

Anvil Mountain Correctional Center (AMCC) Utilidor Domestic Piping Replacement
Renovation
Sub-Bidding
$250,000 CJ est. value
Nome, AK 99762

Anaktuvuk Pass 10-Plex Electrical Systems
Renovation, Infrastructure
Post-Bid
$100,000 CJ est. value
Utqiagvik, AK 99723

Lake-Hirst and Monastery-Kinkead Utility and Street Improvements - City & Borough of Sitka
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Sitka, AK 99835

Richardson Highway MP 359 Railroad Grade Separated Facility and Richardson Highway MP 357-362 Bicycle/Pedestrian Path
Infrastructure
Bidding
$30,000,000 CJ est. value
Valdez, AK 99686

Installation of Gas-Leachate Wells and Gas Vents
Renovation
Sub-Bidding
$608,360 CJ est. value
Palmer, AK 99645

Last Updated 12/27/2022 06:02 AM
Project Title

CHL028 Civil Site Improvements, Chena River Lakes Flood Control Project

Physical Address View project details and contacts
City, State (County) North Pole, AK 99705   (Fairbanks North Star County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $7,658,069 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Dec 20, 2022 Contract Award Number: W911KB23C0006 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: CKLDDEUNBJB4 Contractor Awarded Name: Bristol Prime Contractors, LLC Contractor Awarded Address: Anchorage, AK 99501-6206 USA Base and All Options Value (Total Contract Value): $7658069.00 Updated 6 October 2022: Amendment W911KB22B0004-0003 is posted to PIEE. PROJECT TITLE/LOCATION: CIVIL SITE IMPROVEMENTS (CHL028), CHENA RIVER LAKES FLOOD CONTROL PROJECT, NORTH POLE, ALASKA PROJECT DESCRIPTION: The project is to construct civil site improvements at the Chena River Lakes Flood Control Project near North Pole, Alaska. The site improvements include replacement of approximately 140 dry drainage culverts ranging from 24-inch to 30-inch in diameter, replacement of one 6-foot diameter culvert in River Park, repaving of Laurance Road, paving of parking areas along Laurance Road, paving of Moose Creek Landing Road and Parking Area, and improvements to parking and trails at Bathing Beauty Pond Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 7 Calendar Days prior to bid submission. The magnitude of this project is between $5,000,000 and $10,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents