Similar Projects
Water Main Improvements, Contract A
Bidding
Vermontville, MI

2021 MEDC Infrastructure Improvements Contract 2 – Water Supply
Bidding
Nashville, MI

Meter Maintenance
Post-Bid
Clinton Township, MI

Drop Shaft and Connecting Sewer Rehab-ST-S-4, ST-S-5 and UT-S-1
Post-Bid
Clinton Township, MI

2018 Phase V Service Line Replacement
Results
Flint, MI

Street and Utility Improvements - Washington Street and Dye Street
Results
Less than $1,362,523 est. value
Ionia, MI

Harmon Street Reconstruction And Water Main Replacement
Bidding
Less than $1,500,000 est. value
Saint Clair Shores, MI

Water Pipe and Fittings and Hydrants
Post-Bid
Mount Clemens, MI 48043

Lakewood Boulevard Water Main Replacement River Avenue To Beeline Road
Results
Less than $1,465,569 est. value
Holland, MI

2021 DWSRF Project Areas 4, 5 and 6:Water Main Replacement Project
Bidding
Livonia, MI

Secondary Water Supply
Post-Bid
Less than $8,500,000 est. value
Flint, MI

Michigan Avenue Water Main Replacement
Results
Marshall, MI

Clay Street Water Main Replacement
Bidding
Benton Harbor, MI 49022

DWRF Water Main Improvements
Post-Bid
Spring Arbor, MI

2019 Lead Service Replacement
Results
Kalamazoo, MI 49007

Last Updated 03/23/2021 10:52 AM
Project Title

Water System Improvements- Napier Avenue – Plaza Dr to Pipestone Road

Physical Address View project details and contacts
City, State (County) Benton Harbor, MI 49022   (Berrien County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project primarily consists of furnishing all material and constructing the following approximate quantities: - 3,100` of 6” to 12” Watermain Abandonment - 3,200` of 6” to 12” Watermain Work also includes, but is not limited to, incidental storm sewer removal and replacement, road reconstruction, maintenance of traffic, and restoration. Contractor shall furnish adequate material, equipment, labor, and supervision to complete the specified work, which also includes testing and placing the systems in operation in compliance with the standards of these specifications.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents