Similar Projects
USU Research Greenhouse Building Addition
Addition - 2,000 SF
Bidding
$900,000 est. value
Logan, UT 84341

Biology and Natural Resources Building Addition and Renovation
Post-Bid
Logan, UT

USDA Bee Lab Remodel for Utah State University
Post-Bid
Logan, UT

DFCM Construction-USU Biology & Natural Resource Renovation CMGC
Renovation, Addition - 60,000 SF
Results
Less than $18,500,000 est. value
Logan, UT

DFCM Construction Bridgerland Technical College Health Sciences Building
New Construction
Results
$32,500,000 est. value
Logan, UT 84321

HPER Building Nursing Offices
Renovation
Post-Bid
$425,000 est. value
Logan, UT 84322

CM/GC Services BNR South Wing Phase One Curtain Wall and Seismic Upgrade
Renovation
Results
Logan, UT

Utah State University 2021 Summer Classroom Remodels Project
Renovation
Post-Bid
Logan, UT

DFCM Construction - USU Mehdi Heravi Global Teaching/Learning Center
New Construction - 38,429 SF
Results
$13,500,000 est. value
Logan, UT

EVR Facility Aspire Expansion CM/GC Services
Renovation
Post-Bid
Logan, UT

USU TSC Conference Rooms
Renovation
Results
Logan, UT 84322

Building 95, North End Remodel
Renovation
Post-Bid
Logan, UT 84341

Seating Replacement at Maverik Stadium
Renovation
Results
Logan, UT 84341

USU Blanding PCTE ShopKo Remodel
Renovation
Post-Bid
Logan, UT

CM/GC Services for Salt Lake East Entry and Facility Remodel
Renovation
Post-Bid
Logan, UT

Reported 05/26/2022 12:00 AM
Project Title

Utah State University (USU) Taggart Student Center (TSC) Copy Center Remodel

Physical Address View project details and contacts
City, State (County) Logan, UT 84322   (Cache County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Design-Build. Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Interior remodel of the TSC Copy Center. The owner is agreeable to approved alternate materials that better meet the schedule. The owner is also agreeable to a flexible schedule for long lead items.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents