Similar Projects
Demolition of Existing HVAC System
Post-Bid
Okemos, MI

2016 Bond Issue - (Bid Package 16 - 2834) Pfromm Educational Center Demolition
Demolition
Post-Bid
Warren, MI

Demolition
Demolition
Results
Baldwin, MI

Demolition of a House at 403 Lytle Street
Demolition
Results
Harbor Beach, MI

Airport Demolition Project
Demolition, Term Contract
Post-Bid
Waterford, MI 48327

CDBG Demolition of Structures
Demolition
Results
Less than $19,979 est. value
Lincoln Park, MI

Niles Avenue Demolition Project
Post-Bid
Saint Joseph, MI

34 East Michigan Avenue Tower Demolition
Demolition
Results
Battle Creek, MI

Caro Center-Demo Of Bldg 106 & Ctg 1
Post-Bid
Caro, MI

Demolition/Removal of Garage and Rubbish
Demolition
Results
Less than $3,360 est. value
Royal Oak, MI 48067

Demolition of Structures
Demolition
Post-Bid
Macomb Township, MI 48044

Environmental Abatement and Disposal of Asbestos and Hazardous Materials and Demolition and Disposalof Residential and Commercial Structures in Genesee County
Demolition, Term Contract
Results
Less than $405,267 est. value
Flint, MI 48502

Portable Classroom Demolition
Demolition
Post-Bid
Grand Rapids, MI 49503

Demolition Bid
Demolition
Results
Flint, MI 48507

Demo Residential Housing
Demolition
Post-Bid
Port Huron, MI 48060

Last Updated 07/26/2021 08:49 AM
Project Title

Townline Dam - Dike Demo and Removal

Physical Address View project details and contacts
City, State (County) Lansing, MI   (Ingham County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete removal of an 8-bay concrete drop control structure and earthen dikes at the Townline Creek Dam including clearing, minor grading, and restoration of approximately 4,065 foot access route; placement of soil erosion and sedimentation control devices; controlled lowering of impoundment water level by removal of beaver debris and stop logs; excavation of earthed dikes; site grading; concrete drop control structure demolition including pedestrian sidewalk slab, fencing, piers, stop logs, abutments, wingwalls, base and sheet piling and removal of concrete debris off-site; shape and grade new creek channel; placement of natural channel cobble mix; restoration of all disturbed areas with live staking and native seeding. Pre-bid location:m, starting at a parking area located on the east side of Old US Hwy 27 approximately 12 miles south of West Lake City Road in Houghton Lake. After the initial meeting we will continue by vehicle on a seasonal road approximately 0.5 miles then turning south onto a dirt trail and continue for approximately 1.5 miles to a cul-de-sac where we will park the vehicles. (Longitude: 44d 09m 41.48 s; Latitude: 84d 46m 36.07m) From this point we are required to walk to the dam site. The walking route has been well flagged and meanders approximately 4,000 feet to the dam site.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents