Similar Projects
RFP D/B - Design/Build Services for HVAC Automation Control Upgrades
Renovation
Bidding
$3,685,500 CJ est. value
Stone Mountain, GA 30083

AC for Poplar Springs Gym Rebid
Renovation
Sub-Bidding
$160,351 CJ est. value
Ringgold, GA 30736

Cooling Tower Replacement - Building B Marietta Campus
Renovation
Sub-Bidding
$300,000 CJ est. value
Marietta, GA 30060

Selective Improvements at Four Developments
Alteration
Post-Bid
$350,000 est. value
Metter, GA

HVAC Maintenance
Alteration
Post-Bid
Metter, GA 30439

Design Build Services for The Replacement/Refurbishment of AHUs and Associated Fans
Results
GA

Newnan Campus TERV Replacement
Alteration
Results
$318,427 est. value
Newnan, GA 30263

Annual Contract for Quarterly HVAC Maintenance at the Chatham County Legislative Courthouse
Term Contract
Sub-Bidding
Savannah, GA 31406

Annual Contract for HVAC Repair, Service, and Planned Maintenance for Various Equipment
Term Contract
Post-Bid
GA

Variable Speed Drive-Rotary Screw Air Compressor
Alteration
Results
Decatur, GA 30034

HVAC Revitalization
Renovation
Sub-Bidding
$80,000 CJ est. value
Douglasville, GA 30135

Annual Contract for HVAC Repair, Service, and Planned Maintenance for Trane Equipment
Alteration
Post-Bid
GA

Courthouse HVAC
Alteration
Results
Ringgold, GA 30736

HVAC Maintenance Services
Term Contract
Sub-Bidding
Powder Springs, GA 30127

HVAC Renovations to Pepperell Elementary School
Alteration
Post-Bid
$2,150,000 est. value
Lindale, GA 30147

Last Updated 01/19/2023 01:31 AM
Project Title

HVAC Renovation for Funston Elementary School

Physical Address View project details and contacts
City, State (County) Funston, GA 31753   (Colquitt County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $879,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

HVAC Renovation for Funston Elementary School Project consists of mechanical unit replacement with associated architectural and electrical modifications required for the replacement of indicated units Bid security shall be submitted with each bid in the amount of [5] percent of the bid amount. No bids may be withdrawn for a period of [60] days after opening of bids Bidders shall begin the Work on receipt of the Notice to Proceed (est. January 31,2023) and shall complete the Work prior to December 31, 2023. Bidder shall submit with the bid form an estimated material procurement timeline along with an estimated construction timeline. Bidder shall be advised all work shall be accomplished during non-school hours, weekends, and school holidays. At no point shall the existing mechanical or electrical system be removed or disabled while students and/or teachers are present within the building. Bidders must be properly licensed under the laws governing their respective trades and be able to obtain insurance and bonds required for the Work. A Performance Bond, a separate Labor and Material Payment Bond, and Insurance In a form acceptable to Owner will be required of the successful Bidder Prior to bidding this project, it Is strongly encouraged for bidders to evaluate their current and future workload as it relates to the project timelines specified above.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents