Similar Projects
2020 Barnstable Hollow Field Stone Wall Renovation
Bidding
$75,000 est. value
Hyannis, MA 02601

Removal and Replacement of 46 Existing Culverts
Post-Bid
Less than $17,400,000 est. value

Phosphorus Inactivation of Surficial Sediment - ALUM Treatment
Post-Bid
Less than $525,000 est. value
Harwich, MA

Catch Basin Cleaning
Results
Less than $25,000 est. value
Brewster, MA

Town Neck Beach Dune Restoration
Results
Sandwich, MA 02563

Pleasantwood Drainage Improvements 2019
Post-Bid
Less than $287,000 est. value
Sandwich, MA

Drainage Improvements at Various Locations
Results
Less than $90,000 est. value
Yarmouth, MA

Greenhouse Road Drainage Improvements 2019
Post-Bid
Less than $80,000 est. value
Sandwich, MA

Dredge Pipe
Results
Barnstable, MA

Conant Street and Montello Street Water Main Replacement And Drainage Improvements
Post-Bid
Less than $550,000 est. value
Provincetown, MA

251 Gleason Avenue Drainage
Results
MA

Supply of Hot Mix Asphalt and Drainage Structures
Results
Less than $500,000 est. value
Barnstable, MA 02630

Drainage and Guardrail Items
Term Contract
Results
Less than $500,000 est. value
Barnstable, MA

FY 2019 Road Drainage Improvements
Results
Less than $750,000 est. value
Hyannis, MA

Annual On-Call Drainage Construction Services - 2019
Results
Less than $150,000 est. value
Dennis, MA

Reported 12/05/2018 12:00 AM
Project Title

HDPE Plastic Pipeline to be Used for Discharge of Hydraulically Dredge Material

Physical Address View project details and contacts
City, State (County) Barnstable, MA   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description Supply, delivery and assembly of 4000 linear feet of new HDPE plastic pipeline to be used for discharge of hydraulically dredge material.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents