Similar Projects
CEFCO
New Construction - 6,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Tyler, TX

A-Affordable Storage / Bullard
New Construction, Infrastructure - 200,000 SF
Design
$3,000,000 CJ est. value
Bullard, TX 75757

New Sanctuary - Mt. Sylvan Baptist Church
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Tyler, TX 75702

Dutch Bros Modular - Sitework Only
New Construction, Infrastructure
Post-Bid
Tyler, TX 75703

Baseball Field Turf Replacement
Infrastructure
Results
$311,595 CJ est. value
Lindale, TX 75771

FM 16 - Widen Road - Add Lanes
Infrastructure
Results
$44,362,527 CJ est. value
Lindale, TX 75771

7-Eleven
Renovation - 3,000 SF
Construction
Tyler, TX 75702

7-Eleven
New Construction - 4,000 SF
Construction
$1,200,000 est. value
Tyler, TX 75703

Amazon River's Edge / Caldwell Zoo
New Construction, Infrastructure - 130,000 SF
Pending Verification
$10,000,000 CJ est. value
Tyler, TX 75702

Patterson Tyler Hyundai - Showroom Modernization
Renovation - 6,110 SF
Pending Verification
$500,000 CJ est. value
Tyler, TX 75701

Hospitality Health ER Expansion
New Construction, Infrastructure - 26,000 SF
Design
$2,500,000 CJ est. value
Tyler, TX 75701

Hubbard Middle School
Demolition, New Construction, Infrastructure - 170,000 SF
Post-Bid
$45,000,000 CJ est. value
Tyler, TX 75703

Bicycle and Pedestrian Improvements
Infrastructure
Results
$548,791 CJ est. value
Tyler, TX 75701

Triple J's Convenience Store
New Construction - 9,000 SF
Construction
$2,000,000 est. value
Whitehouse, TX

Gentry Plaza Remodel and Expansion
Addition, Demolition, Infrastructure, Renovation - 6,201 SF
Pending Verification
$200,000 CJ est. value
Tyler, TX 75702

Last Updated 08/17/2022 02:13 PM
Project Title

Classic Toyota of Tyler - Detail Building

Physical Address View project details and contacts
City, State (County) Tyler, TX 75701   (Smith County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ground up construction of detail building. As of August 17, 2022 a permit has been applied for but not approved yet. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

5,800 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents