Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

County Line Road: I-294 Ramp to North Avenue
Post-Bid
IL

Terminal Area Fire Main Relocation - Lower Level Utility and Pavement Reconstruction
Results
Chicago, IL

NCP Hibbard Elementary School
Results
Chicago, IL 60625

Woodfield Village Green Demolition & Shell Package
Renovation, Demolition - 101,267 SF
Construction
Schaumburg, IL 60173

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

STEAM Lab at Karel Havlicek ES
Renovation
Post-Bid
Berwyn, IL 60402

Pavement Resurfacing
Results
Less than $2,760,387 est. value
Palatine, IL

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Chicago Department of Transportation Job Order Contract for Flatwork - Site Work
Post-Bid
Chicago, IL

Crack Filling/Seal Coating/Striping at Triphahn Center Parking
Results
Hoffman Estates, IL 60169

Asphalt Work at Four District Locations
Post-Bid
Flossmoor, IL

Reported 09/02/2022 12:00 AM
Project Title

2022 Site Renovations - REBID

Physical Address View project details and contacts
City, State (County) Matteson, IL 60443   (Cook County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding,
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work will Occur at Marya Yates Elementary School 6131 Allmen Drive IL 60443, Neil Armstrong Elementary School 5030 Imperial Drive Richton Park IL 60471, Sieden Prairie Elementary School 725 Notre Dame Drive Matteson IL 60443 and Woodgate Elementary School 101 Central Ave IL 60443 Approximate range of Construction Cost $500,000.00 to $700,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated Award of Contract date: September 14, 2022 Anticipated Start of Construction: September 15, 2022 Anticipated Substantial Completion date: Phase I, November 25, 2022 Complete Playground Site Preparation Phase II, August 12, 2023 Complete Parking Lot/Sidewalk Site Preparation

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents