Similar Projects
Oregon Splash Pad - Village of Oregon
New Construction
Design
$970,000 est. value
Oregon, WI 53575

2022 Oak Knoll Tennis Court
Renovation
Bidding
$200,000 est. value
Stoughton, WI

2022 Rennebohm Park West Tennis Courts
Renovation
Bidding
$268,924 est. value
Madison, WI 53705

Orfan Park Tennis Court and Basketball Court Resurfacing Project
Post-Bid
Less than $50,000 est. value
Sun Prairie, WI 53590

Birkinbine, Grandview, Reserve and West Prairie Village Parks Playground Project
Post-Bid
$280,000 est. value
Sun Prairie, WI 53590

Sheehan Park Concrete Skate Park Addition
Addition - 4,600 SF
Results
Less than $275,000 est. value
Sun Prairie, WI 53590

Wetmore Park Splashpad and Playground
Results
Less than $1,000,000 est. value
Sun Prairie, WI 53590

The Boneyard
New Construction - 2,400 SF
Construction
$500,000 to $1,000,000 CJ est. value
Madison, WI

PlayGround Components
Post-Bid
Cottage Grove, WI 53527

Playground Design at Sunnybrook Park
Results
$55,000 est. value
De Forest, WI

Inclusive Playgrounds for Rennebohm Park and Warner Park
New Construction
Post-Bid
Madison, WI 53705

Stone Bridge Park Improvements
Results
Monona, WI 53716

2022 Blue Ridge Park Tennis Court Rehabilitation Project
Renovation
Post-Bid
Waunakee, WI 53597

McGaw Park Pickleball
Results
Fitchburg, WI 53711

2022 Savannah Park Reconstruction Project
Renovation
Post-Bid
Waunakee, WI 53597

Last Updated 07/05/2022 01:44 AM
Project Title

2022 Park Improvements

Physical Address View project details and contacts
City, State (County) Cottage Grove, WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Demolition of existing park elements, grading of existing park locations for construction of concrete sidewalk, asphalt multi use path, pickleball courts, and playground equipment. Other park site improvements include a fishing pier, concrete sidewalk and benches, shelter, minor storm sewer pipe and appurtenances, temporary erosion control, and site restoration of all park improvement sites.

Details

Park/Playground, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents