Similar Projects
New Boiler Room Construction
New Construction
Design
Jackson, MS

Ellzey Hall Renovations
Renovation
Bidding
Wesson, MS 39191

Brevard Hall - Building Envelope Renovation
Renovation
Bidding
Oxford, MS 38655

Student Services Building
New Construction
Post-Bid
Clarksdale, Jackson, MS 38614

Student Services Building
New Construction
Post-Bid
Clarksdale, Jackson, MS 38614

Fountain Hall Improvements
Renovation
Results
$159,500 est. value
Raymond, MS

Jim and Thomas Duff Center for Science and Technology Innovation
New Construction
Results
University, MS 38677

Rowan Hall Second Floor Renovation
Renovation
Construction
$463,700 est. value
Lorman, MS 39096

Culinary Arts Building MUW
New Construction
Construction
$15,000,000 est. value
Columbus, MS 39701

Phase One, Addition and Renovation to Humphrey Coliseum (Concourse)
Renovation, Addition
Bidding
Starkville, MS 39759

2021 Summer Classroom Modifications
Renovation
Post-Bid
Oxford, MS

Career-Technical Improvements Hinds Community College
Renovation
Results
$2,200,000 to $3,000,000 est. value
Raymond, MS 39154

Renovations to Jackson Hall
Renovation
Bidding
Perkinston, MS

Phase East West Corridor
New Construction
Post-Bid
Mississippi State, Starkville, MS 39759

Fine Arts Building Renovation
Renovation
Results
Fulton, MS 38843

Reported 12/16/2021 09:45 AM
Project Title

T. B. Ellis Central Plant Project

Physical Address View project details and contacts
City, State (County) Jackson, MS 39217   (Hinds County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Complete as of December 2022
Bids Due View project details and contacts
Estimated Value $2,160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Jackson state university (JSU) T.B. Ellis central plant project includes but is not limited to: 1. General construction of new central mechanical plant. 2. Installation of a new 300-ton water cooled centrifugal chiller, piping, pumps, insulation and connect to existing EMCS system. 3. Installation of (3) condensing natural gas fired boilers, piping, pumps, stacks, insulation and connect to existing EMCS system. 4. Installation of one new air handing unit, exhaust fan, refrigerant monitoring system to comply with ASHRAE 15. 5. Install new electrical system.

Details

College/University, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals, Cold-Formed Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents