Similar Projects
Chip and Fog Seal and Pavement Markings on Pleasantview Road
Infrastructure
Design
$232,000 CJ est. value
Pellston, MI 49769

Paving & Site Lighting
Post-Bid

Stage and Ramping System
Post-Bid
Petoskey, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Calumet-Swedetown Trail Capping, And Route Grading
Results

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Petoskey State Park Non-Motorized Trail Improvements
Results
Petoskey, MI 49770

Pre Qualified Maintenance - Cold Water Welcome Center-HMA-I-69
Infrastructure
Post-Bid

2021 Greenwood/Cemetery Road - Road and Utility Rebuild
Results
Petoskey, MI 49770

2022 State Street Sidewalk Project
Infrastructure
Post-Bid
$300,000 est. value
Petoskey, MI

Quanicassee River BAS - Improvements
Results

Concrete Installation and Replacement District-Wide - District Wide Sidewalk Replacement
Infrastructure
Post-Bid
$250,000 CJ est. value
Pellston, MI 49769

2.00 MI of Overband Crack Fill, Single Course Chip Seal
Results
Mackinaw City, MI

Victories Square Phase 2 Green Infrastructure Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Harbor Springs, MI 49740

Road Repair - Skip Paving, HMA
Infrastructure
Results

Last Updated 08/09/2022 09:34 AM
Project Title

Bayfront Park West - Solanus Beach Improvements - City of Petoskey

Physical Address View project details and contacts
City, State (County) Petoskey, MI 49770   (Emmet County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Misc. Recreational, Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of public access and restrooms based on 2020 feasibility study results. May include shoreline stabilization improvements. As of March 18, 2022 this project is in the City of Petoskey 2022-2027 CIP. Bidding for design team, contractor selection or a firm timeline has not been established.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents