Similar Projects
Sand Trace
New Construction
Conception
Smithfield, RI 02917

Two Family Dwelling
Renovation - 4,420 SF
Conception
Cranston, RI 02910

Hope Mill Redevelopment
New Construction, Renovation - 116,030 SF
Design
$56,000,000 est. value
Scituate, RI 02815

Knight Street Mixed Use
New Construction, Build-Out - 16,411 SF
Design
Providence, RI

Bernon Mill
New Construction
Sub-Bidding
$22,000,000 to $25,000,000 est. value
Woonsocket, RI 02895

Phase 2 Apartment Kitchen Upgrades at Wilfrid Manor, RI 4-1 and Forand Manor, RI 4-2
Renovation
Post-Bid
Central Falls, RI 02863

Interior Upgrades to Arlington and Hall Manors
Renovation
Results
Cranston, RI 02920

Apartment Kitchen Upgrades at Wilfrid Manor
Renovation
Results
Central Falls, RI

Clock Tower Residences - Phases II and III
New Construction, Renovation - 70,000 SF
Construction
Pawtucket, RI 02860

Park View Residence
New Construction, Renovation - 22,280 SF
Construction
$2,642,200 est. value
Providence, RI 02909

Park Avenue Residential
Renovation
Pending Verification
Cranston, RI

Mill Street Apartments
Renovation - 17,318 SF
Pending Verification
Johnston, RI 02919

Ontario Street Apartments
Renovation - 10,824 SF
Conception
Providence, RI 02907

Parcel 9
New Construction - 155,000 SF
Design
$48,000,000 est. value
Providence, RI

Completing Elevator Modernization at Parkview Manor
Renovation
Results
Woonsocket, RI 02895

Last Updated 06/21/2022 02:58 AM
Project Title

Toilet Room Upgrades at Wilfrid Manor, RI 4-1, Forand Manor, RI 4-2 and Forand Manor Annex, RI 4-4

Physical Address View project details and contacts
City, State (County) Central Falls, RI   (Providence County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally includes, but is not limited to the following: (Refer to Section 01100, Summary of the Work for additional information) Replacement of suspended acoustical tile ceilings and lighting, new floor and wall finishes, new automatic hand dryers, toilet room accessories and replacement of plumbing fixtures. There is a total of six (6) toilet rooms, in the scope, at the following locations: Single-user Men's Toilet Room, Ground Floor of Wilfrid ManorSingle-user Women's Toilet Room, Ground Floor of Wilfrid ManorSingle-user Men's Toilet Room, Ground Floor of Forand ManorSingle-user Women's Toilet Room, Ground Floor of Forand ManorSingle-user Unisex/Family Toilet Room, Ground Floor of Forand Manor AnnexSingle-user Staff Toilet Room, Ground Floor of Forand Manor Annex

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents