Details |
Division 01 - | General Requirements, Vehicular Access and Parking, Temporary Access Roads, Examination and Preparation, Mobilization, Cleaning and Waste Management, Construction Waste Management and Disposal. | Division 02 - | Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling, Removal and Disposal of Contaminated Soils. | Division 03 - | Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete. | Division 04 - | Masonry, Unit Masonry. | Division 05 - | Metals, Structural Metal Framing, Structural Steel Framing. | Division 06 - | Wood, Plastics, and Composites, Rough Carpentry. | Division 07 - | Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers. | Division 08 - | Openings, Doors and Frames, Windows, Hardware, Glazing. | Division 09 - | Finishes, Flooring, Painting and Coating. | Division 10 - | Specialties, Signage, Safety Specialties, Lockers, Flagpoles. | Division 11 - | Equipment, Laboratory Equipment. | Division 12 - | Furnishings. | Division 13 - | Special Construction. | Division 14 - | Conveying Equipment, Lifts. | Division 21 - | Fire Suppression, Fire-Extinguishing Systems. | Division 22 - | Plumbing, Facility Storm Drainage, Storm Drainage Piping Specialties. | Division 23 - | Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units. | Division 26 - | Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting. | Division 27 - | Communications, Data Communications, Audio-Video Communications. | Division 28 - | Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm. | Division 31 - | Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Trenching and Backfilling, Erosion and Sedimentation Controls, Retention Measures for Erosion and Sedimentation Controls, Earthwork Methods, Soil Reinforcement. | Division 32 - | Exterior Improvements, Common Work Results for Exterior Improvements, Aggregates for Exterior Improvements, Base Courses, Aggregate Base Courses, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses, Seeding. | Division 33 - | Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Extraction Wells, Well Abandonment, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Storm Drainage Structures, Storm Drainage Water Retention Structures, Electrical Utilities, Communications Utilities. | Division 40 - | Process Integration, Water Process Piping, Potable Water Process Piping, Instrumentation and Control for Process Systems. | Division 41 - | Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists. | Division 44 - | Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment. | Division 46 - | Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment. |
|