Similar Projects
Water Meter
Post-Bid
Homestead, FL 33030

450 Fire Hydrant Meter 3
Post-Bid
Homestead, FL 33030

Miami Springs Water System Fire Flow and Water Service Improvements Phase 2
Results
Less than $2,597,874 est. value
FL

Camp Matecumbe - Relocation Utility Underground and Force Main Installation
Results
Less than $502,496 est. value
FL

Furnish and Install 36 inch D.I. Water Main along NW 106 Street, from NW 107 Avenue to NW South River Drive
Post-Bid
Less than $8,601,638 est. value
Miami, FL 33146

Install of 8 inch DI Watermain in SW 147 Avenue and 152 Avenue on 288 Street and 296 Street
Results
Less than $2,203,884 est. value
FL

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Post-Bid

CD 4.9 65 Replacement of 6 Inch Asbestos Cement Pipe Force Main from Pump Station 1005
Results
Less than $620,000 est. value
FL

CD 4.9 60-62 Replacement of 8 Inch Asbestos Cement Pipe Force Main from Pump Station 1013
Results
Less than $1,063,469 est. value
FL

Rehabilitation of 54-Inch PCCP Forcemain on West Flagler Street from SW 78th Place to Meter Station East of SW 72nd Avenue
Results
Less than $4,654,895 est. value
FL

Automated Meter Reading/Advanced Metering Infrastructure (AMR/AMI) System
Results
Miami Beach, FL

Trenchless Pipe Installation and Pipe Rehabilitation Services
Results
Less than $883,954 est. value
FL

Furnish and Install 8 Inch Di Force Main
Results
Less than $318,597 est. value
FL

Raw Water Valves
Results
Homestead, FL

Furnish and Install 8 Inch DI FM Along SW 180 Street from PS 727 to MH 0052
Results
Less than $417,526 est. value
FL

Last Updated 01/30/2019 07:42 AM
Project Title

Advanced Metering Infrastructure Program

Physical Address View project details and contacts
City, State (County) North Miami, FL   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Fixed Base Advanced Metering Infrastructure and Water Loss Management system to read meters in an automated and cost effective manner as well as reduce the City of North Miami's unaccounted for and non-revenue water. Location: 1. City Hall - 776 North East 125 Street, 4 story building 2.Motor Pool - 1855 North East 142 Street, 2 story building 3.Winson Water Treatment Plant - 12098 North West 11 Avenue, 2 story building 4. Joe Celestin Center - 1525 North West 135 Street, 2 story building
Details
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents