Similar Projects
Main Campus Boiler Replacement Project
Alteration
Bidding
$481,000 est. value
Albany, OR 97321

LBCC Water Heater Replacement Project
Alteration
Bidding
$200,000 est. value
Albany, OR 97321

Cleanroom Deep Reactive Ion Etcher Plasama Dep
Alteration
Post-Bid
Eugene, OR

FMS - Facilities Support: Maintenance and Repair BPA
Term Contract
Post-Bid
$2,500 to $300,000 est. value
Roseburg, OR 97471

Kliever Armory Boiler Replacement and HVAC Updates
Alteration
Results
$370,000 to $395,000 est. value
Portland, OR 97211

Hood River Armory Boiler Replacement
Alteration
Results
$220,000 to $260,000 est. value
Hood River, OR 97031

Walk-In Cooler/Freezer at Whiteaker Head Start Facility (Equipment Only)
Alteration
Bidding
Eugene, OR 97402

Annual Boiler Service
Term Contract
Post-Bid
Portland, OR 97214

HVAC - Boiler Support and Maintenance
Alteration
Results
OR

Linn-Benton Community College Main Campus Chiller Replacement
Alteration
Bidding
$200,000 est. value
Albany, OR 97321

Boiler BEI Testing and Boiler Tuning
Term Contract
Post-Bid
Roseburg, OR 97471

UO Baker Center Roof Replacement PH2 Area F
New Construction, Demolition, Alteration
Results

On-Call and Emergency Mechanical and HVAC Services
Term Contract
Post-Bid
Less than $50,000 est. value
Redmond, OR

DMV Headquarters HVAC Upgrades
Term Contract
Results
$200,000 est. value
Salem, OR 97314

Lasells Stewart Center Mechanical and Roof Renewal
Alteration
Post-Bid
Corvallis, OR 97331

Last Updated 07/04/2022 12:12 AM
Project Title

Hugh Hartman Elementary School Mechanical Upgrade Project

Physical Address View project details and contacts
City, State (County) Redmond, OR 97756   (Deschutes County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $454,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consist of disconnect and removal of two existing gas cast iron boilers with 2 central heating water pumps and associated piping within the boiler room for replacement with new heating water boiler plant. The existing common boiler flue will be replaced with individual boiler stacks through the roof and will require patching of the existing ceiling/roof opening. The scope will include disconnect and removal of existing gas domestic water boilers with associated 2 recirculating water pumps and housekeeping pad. Existing common flue with blower through roof will be removed. The ceiling/roof patching will be required. The new domestic water plant will include three gas high efficiency condensing water heaters with 2 recirculating water pumps and central thermostatic mixing valve. Both systems will require new housekeeping pads, for each boiler and one for domestic water heaters. Electrical scope will include replacement of existing motor control center MCC-4 with new panel and circuit breaker in the boiler room and low voltage scope to re-connect new equipment to existing control panel.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents