Last Updated | 08/26/2022 09:02 AM |
Project Title | Western Maintenance Facility Phase 1 |
Physical Address | View project details and contacts |
City, State (County) | Palm Beach Gardens, FL 33410 (Palm Beach County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $1,400,000 [brand] Estimate |
Plans Available from | Civil Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project comprises the installation of utilities, drainage, landscape, irrigation, concrete, and asphalt for a site development in the City of Palm Beach Gardens, Florida. The Contract is a UNIT PRICE contract. A cashier's check or a Bid Bond in a sum not less than five percent (5%) of the amount of the bid, made payable to Seacoast Utility Authority ("Bid Security") shall accompany each Bid as a guarantee that the bidder will not withdraw from the competition after the opening of Bids. The sureties for the Bid Bond and Public Construction Bond must be an entity included in the most recent United States Department of Treasury list of acceptable sureties and be authorized to issue surety bonds in Florida. Bid Security shall be in a single acceptable instrument. If Bid Security is made by cashier's check, the conditions contained in the Bid Bond shall nonetheless apply to the cashier's check as they relate to forfeiture or damages. No Bids may be withdrawn for a period of ninety (90) days after the day of Bid opening. The cost of Bid preparation is considered an operational cost of Bidders and shall not be passed on or borne by the Owner. The Successful Bidder, who is awarded the contract, will be required to furnish a Public Construction Bond in full contract amount in accordance with Florida Statute Section 255.05, and to submit a Certificate of Insurance demonstrating conformance with the Contract Documents. For the project Builder's Risk Insurance is not required. Failing to do so shall be grounds to reject the bid and shall result in the Owner retaining the Bid Security to the full extent of Owner's damages. Bids shall be prepared, addressed and submitted in compliance with detailed instructions as set forth in the Instructions to Bidders All forms and questionnaires must be filled out completely as instructed. Failure to complete the bid forms as instructed and provide the requested information, or to fully execute the bid, shall be grounds for rejection of the bid and shall result in the Owner retaining the Bid Security to the full extent of Owner's damages. Seacoast Utility Authority reserves the right to reject any or all Bids in whole or in part, with or without cause, to waive irregularities, variances, deviations, technical errors and informalities to the extent permitted by law, or to accept the Bid which in its judgment best serves the public interest. Seacoast Utility Authority Jessica Moore, Clerk All bids in duplicate (one original and one copy) shall be in sealed envelopes addressed to Purchasing Agent, Seacoast Utility Authority, 4200 Hood Road, Palm Beach Gardens, Florida 33410 and plainly marked on the outside: PROJECT BID NO: N2003 PROJECT NAME: WESTERN MAINTENANCE FACILITY PHASE 1 Questions shall be directed to Suzanne Dombrowski via email, sdombrowski@chenmoore.com no later than September 7, 2022. Award of Bid: September 28, 2022 Notice to Proceed: October 2022 Substantial Completion 180 calendar days from NTP Final Completion 210 calendar days from NTP |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |