Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

District-Wide HVAC Improvements
Renovation
Design
$412,435 CJ est. value
Richmond, IL 60071

RFP - HVAC Repair and Maintenance Services
Term Contract
Bidding
Chicago, IL 60616

Replace Air Handlers Joliet Junior College
Renovation
Sub-Bidding
$5,000,000 CJ est. value
Joliet, IL 60431

Replace HVAC - Statewide Program - ISP District 6 and ISP District 16
Renovation
Sub-Bidding
$1,500,000 CJ est. value
Pontiac, IL 61764

Update HVAC Controls - Heating
Results
Less than $2,000,000 est. value
Springfield, IL 62702

Upgrade HVAC System/Fountain Repairs
Results
Less than $600,000 est. value
Springfield, IL 62703

HVAC Equipment
Term Contract
Design
$205,000 CJ est. value
Addison, IL 60101

2023 Chiller Replacements at Naperville North High School
Renovation
Sub-Bidding
$1,025,000 CJ est. value
Naperville, IL 60563

Lincoln Correctional Center HVAC Repair And Maintenance
Term Contract
Results
Lincoln, IL

DNR Des Plaines HVAC Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
Wilmington, IL 60481

HVAC Chiller Maintenance
Term Contract
Results
Scott Air Force Base, IL 62225

DNR Moraine Hills HVAC Replacement
Renovation
Sub-Bidding
$300,000 CJ est. value
McHenry, IL 60051

Make-Up Air Units -- Building 299 -- Rock Island Arsenal
Term Contract
Results
$1,000,000 to $5,000,000 est. value
Rock Island, IL 61299

Re-Bid Crystal Lake City Hall Water Heater Replacement
Renovation
Sub-Bidding
$2,000 CJ est. value
Crystal Lake, IL 60014

Last Updated 02/27/2023 11:12 AM
Project Title

United HVAC - 2023 work at the United Senior High School

Physical Address View project details and contacts
City, State (County) Monmouth, IL 61462   (Warren County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,036,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Contract Documents, including plans, specifications, instructions to bidders and proposal forms may be examined at the office of: Graham and Hyde Architects, Inc. 344 West Chestnut, Canton, Illinois 61520 For digital sets: No deposit required Proposals shall be accompanied by Bid Guarantee in form of a Bid Bond for 5 percent of the gross amount of the bid, made payable as described in the Contract Documents. Such bid bond shall be forfeited as liquidated damages by the Bidder should he fail to enter into a contract and furnish a satisfactory performance bond within the following number of days: 7 after notification of acceptance of his proposal. The bid bonds of all excepting the three lowest formal bidders will be returned within the following number of days after bid opening: 7 and the remaining bid bonds will be returned within the following number of days after bid opening: 30, with the exception mentioned above. All proposals must be made on forms furnished by the architect. No bid may be withdrawn after scheduled closing time for the receipt of bids for at least this number of calendar days: 30 The Owner reserves the right to reject any and all bids and to waive any informalities in bidding. All work performed on this project shall comply with Illinois Statutes concerning payment of prevailing wages. All contractors and subcontractors shall comply with Illinois Statutes concerning mandatory drug testing for all workers on this project.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents