Similar Projects
Reroofing, Siding and Porches at Development
Alteration
Bidding
$800,000 est. value
Union, SC

Hartsville Middle School (HMS) / Darlington Middle School (DMS) Safety Rail Systems on Roofs
Alteration
Bidding
$25,000 to $35,000 est. value
Hartsville, SC

Remove Damaged and Install New Sun Shade
Post-Bid
Blythewood, SC 29016

Comprehensive Purchasing Consortium for CCHRCO
Post-Bid

Exterior Stair and Rail Replacement
Results
Charleston, SC 29403

Fike Recreation Center Envelope Repair
Results
$275,000 to $300,000 est. value
Clemson, SC 29634

Health Science Building Exterior Sealing and Caulking
Alteration
Bidding
$200,000 to $210,000 est. value
Spartanburg, SC 29303

Ramp Modification
Post-Bid
$20,000 est. value
Columbia, SC

Engineering Building Exterior Stairs Renovation Project
Results
Spartanburg, SC 29306

Chester County Courthouse Waterproofing Project
Alteration
Bidding
$60,000 to $100,000 est. value
Chester, SC 29706

Ramp Modification
Post-Bid
$20,000 est. value
Union, SC

Install Millwork
Results
Summerville, SC 29483

Add Gutters to Buildings Watkins Center
Post-Bid
$25,000 to $40,000 est. value
SC 29210

Removal of Outside Stairs
Results
Cheraw, SC 29520

Awning Removal/Replacement Project
Post-Bid
Inman, SC 29349

Last Updated 05/23/2022 01:16 AM
Project Title

Canopy for Wren Middle School

Physical Address View project details and contacts
City, State (County) Piedmont, SC 29673   (Anderson County)
Category(s) Single Trades
Sub-Category(s) Finishes/Exterior
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct a prefinished aluminum hanger rod-style canopy. - Area to be covered is approximately 6'8" x 67'8". - Canopy should be constructed with 6" tall J-style gutter fascia on all perimeter sides, with flat soffit style decking. - Canopy should be supported with 1.5" square Schedule 40 aluminum hanger rods, spaced approx 6' apart across the length of the canopy, approx. 11 hanger rods. - Canopy should drain water using 'drain scuppers' at the front edge of the canopy, approx. 3. - New construction is to match color of current on-site canopies in other areas of the school - Clear Anodized. - Canopy is to adjoin existing ACM metal canopy at entry door. Fabrication/installation should include a rain channel to redirect water at the right side of the existing canopy so it drains toward the outer edge of canopy

Details

Division 09 - Finishes.
Division 10 - Specialties, Protective Covers, Canopies.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents