Similar Projects
Carr Lane Manufacturing Facility
New Construction - 50,000 SF
Design
$6,000,000 est. value
Elgin, TX

Yerico Manufacturing Warehouse
New Construction, Infrastructure - 30,000 SF
Design
$2,500,000 CJ est. value
Elgin, TX 78621

Simsboro Aquifer Water Treatment Plant Bid Package No. 10
New Construction, Infrastructure
Bidding
$35,000,000 CJ est. value
Bastrop, TX 78602

FM 1100 - Resurface Roadway
Infrastructure
Bidding
$394,167 CJ est. value
Elgin, TX 78621

Simsboro Aquifer Water Supply Facilities - Package 5 - Electrical and I and C Construction
New Construction, Infrastructure
Sub-Bidding
$35,000,000 CJ est. value
Bastrop, TX 78602

Simsboro Aquifer Water Treatment Plant - Package 4 - Water Treatment Plant Construction
New Construction, Infrastructure
Sub-Bidding
$850,000 CJ est. value
Bastrop, TX 78602

East Construction of Sitework, Fencing, Planting and Irrigation
Alteration
Post-Bid
Bastrop, TX

ADELTON - Section I, Phase I - Sitework / Planting / Irrigation
Infrastructure
Post-Bid
$270,000 CJ est. value
Bastrop, TX 78602

Design Build Precinct 3 Road and Bridge Facility Construction Project
New Construction
Results
TX

Sections 6, 7 and Regional Detention Pond Improvements
Infrastructure
Results
Bastrop, TX

Bastrop Rapid Express / Rapid Express Car Wash
New Construction, Infrastructure - 4,000 SF
Pending Verification
$1,500,000 CJ est. value
Bastrop, TX 78602

Line 204 Studios-Stage B
New Construction, Infrastructure - 25,597 SF
Pending Verification
$8,000,000 CJ est. value
Bastrop, TX 78602

Southside Market Headquarters
New Construction, Infrastructure - 5,000 SF
Design
$1,000,000 CJ est. value
Elgin, TX 78621

2022 Street Improvements Project
Infrastructure
Bidding
$400,000 CJ est. value
Elgin, TX 78621

Construction of the Colony M.U.D. 1C, Section 8
Infrastructure
Post-Bid
$880,000 CJ est. value
Bastrop, TX 78602

Last Updated 09/14/2022 02:03 PM
Project Title

Yerico Manufacturing - Manufacturing Space & Accessory Office

Physical Address View project details and contacts
City, State (County) Elgin, TX 78621   (Bastrop County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans consist of a one-story 20,064 SF new building. 14,814 SF Manufacturing space and 5,250 SF accessory office. As of September 14, 2022, this project has been submitted for permitting and is under review. A construction start date has not been disclosed.

Details

,, 20,064 SF - Office, 5,250 SF New Construction, Manufacturing/Processing Plant, 14,814 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Laboratory Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents