Similar Projects
2021 Water & Sewer Division Emergency Repair
Term Contract
Post-Bid
Aurora, IL 60505

2021 HMS Culvert Replacement - Bid Release 4
Post-Bid
Hampshire, IL 60140

Ridge Lane Drainage Improvements
Results
Less than $147,555 est. value
Geneva, IL 60134

2020 Britta Lane Drainage Improvements
Results
Geneva, IL 60134

2021 Sanitary and Storm Sewer Lining - C.I.P.P
Post-Bid
Batavia, Saint Charles, IL

2020 Street Program Wellington Laurel
Renovation
Results
Elgin, IL 60120

Parking Lot N4 Drainage Improvements
Post-Bid
Sugar Grove, IL 60554

Virgil - 2020 Drainage Improvements
Results
Less than $43,301 est. value
Virgil, IL 60151

2021 Ward 1 Storm Sewer Reconstruction – Phase 4
Post-Bid
Batavia, IL

Fox River Trail Culvert Repair and Improvements
Results
Elgin, IL 60120

Highland Avenue Storm Sewer Improvement
Results
Less than $112,154 est. value
Hampshire, IL 60140

National Tool Driveway
Results
Less than $261,459 est. value
East Dundee, IL

Jackson Street & Benton Street Sewer Separation
Renovation
Results
Less than $531,573 est. value
Aurora, IL 60504

Ellithorpe Road Culvert Replacement
Results
Burlington, IL 60140

Improvement Consists of a Culvert Repair of the Structure (SN 045-0299)
Results
IL

Last Updated 12/10/2020 10:26 AM
Project Title

7th Avenue Creek Construction Phase 1

Physical Address View project details and contacts
City, State (County) Saint Charles, IL   (Kane County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of storm sewer box culverts, installation of approximately 2000 foot of new sanitary sewer main, regrading and re-meandering the creek from S. 10th Avenue to South Avenue, as well as other appurtenant work. Improvements are located within the City of St. Charles, Kane County, Illinois. The work is in the 7th Avenue Creek Corridor, east of 7th Avenue, starting from the southern right-of-way line for Washington Avenue and terminating at 10th Avenue for an approximate length of 2,150 feet for channel improvements. The existing culverts for South Avenue, Indiana Avenue and Illinois Avenue will be removed and replaced with precast box culverts. The existing culvert on South Avenue is approximately 65 feet east of 7th Avenue centerline. The existing culvert on Indiana Avenue is approximately 95 feet east of 7th Avenue centerline. The existing culvert on Illinois Avenue is approximately 350 feet east of 7th Avenue centerline. Removal and replacement of storm sewer box culverts, installation of approximately 2,000 foot of new sanitary sewer main, regrading and re-meandering the creek from South 10th Avenue to South Avenue, as well as other appurtenant work.

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents