Similar Projects
Runway 3 End and Partial Parallel Taxiway Rehabilitation
Infrastructure
Bidding
$600,000 est. value
Ghent, NY 12075

Apron Reconstruction & Taxiway Rehabilitation at Ticonderoga Municipal Airport
Infrastructure
Bidding
Ticonderoga, NY

Jamestown Airport Runway 7-25 Rehabilitation
Post-Bid
Jamestown, NY 14701

Taxiway A Rehabilitation - Phase III - TW - A, D and GA Apron
Post-Bid
Ithaca, NY 14850

Watertown International Airport Runway 7-25 and Intersection Rehabilitation Project
Results
Watertown, NY 13601

North Apron Reconstruction
Results
Ghent, NY 12075

Skaneateles Aerodrome Runway 10 Safety Improvements 2020
Construction
Skaneateles, NY 13152

Aircraft Parking Apron Concrete Repairs
Term Contract
Post-Bid
$100,000 to $250,000 est. value
Newburgh, NY 12550

Repair Airfield Pavements
Results
$1,000,000 to $5,000,000 est. value
Syracuse, NY 13211

Liquid Runway Deicer
Infrastructure
Post-Bid
Ronkonkoma, NY 11779

Runway 17-35 Rehabilitation - Phases II-IV at Plattsburgh International Airport
Results
Less than $12,500,000 est. value
Plattsburgh, NY 12903

Elmira Corning Regional Airport Terminal Apron Reconstruction (East)
Results
Horseheads, NY 14845

NFIA - Rehabilitate and Reconstruct Taxiway D
Results
Less than $4,000,000 est. value
Niagara Falls, NY 14304

Runway Pavement Maintenance At Griffiss International Airport
Results
Rome, NY 13441

Cortland County Airport - Rehabilitation of Runway 6-24
Results
Cortland, NY 13045

Last Updated 02/18/2022 09:34 AM
Project Title

Runway 6-24 Rehabilitation at Oswego Co Airport

Physical Address View project details and contacts
City, State (County) Fulton, NY 13069   (Oswego County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes the rehabilitation of Runway 6-24. The existing runway is 4,000 feet long by 100 feet wide and encompasses a total area of approximately 400,000 sf. Pavement rehabilitation includes partial variable depth asphalt removal by cold milling, hot-mix asphalt overlay and pavement repairs. Also included in the project are pavement markings and turf restoration adjacent to the runway edges. The runway and turf surfaces will be regraded as necessary to improve drainage while maintaining FAA allowable surface grades. The project includes two add-on bids, one for closed drainage system replacement and one for pavement removal. The add-on bids are being provided to allow for FAA AIP grant funding flexibility.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents