Similar Projects
Construction of Joiner Road Water Treatment Plant - New Treatment Facility Well No. 4
New Construction
Bidding
Tennille, GA 31089

Annual Contract For Cipp Rehabilitation
Alteration
Bidding
$2,000,000 to $2,500,000 est. value
GA

Warner Range Potable Water Well
Post-Bid
Columbus, GA 31901

Pearl Street Well Replacement
Post-Bid
Shellman, GA

2020 Water System Improvements - Andrews Well 2
Results
Carnesville, GA 30521

F. Wayne Hill Water Resources Center (WRC) Backwash Waste Pump Replacement
Results
Buford, GA 30519

17th Street Well House Piping
Renovation
Bidding
Rincon, GA 31326

Bypass Pumping Services on an Annual Contract
Term Contract
Post-Bid
GA

Myers Middle School Boiler and Pumps Replacement
Results
Savannah, GA 31404

High Service Pump Motor And Valve Replacement
Infrastructure
Bidding
$250,000 est. value
Washington, GA

Water Softening System
Infrastructure
Post-Bid
Mount Vernon, GA

Contract A: New Well and Chemical Feed System
Results
Less than $800,000 est. value
Abbeville, GA

Water Supply Wells 13 and 14
Term Contract
Bidding
$300,000 est. value
Sandersville, GA

Drinking Water Filteration System
Renovation, Infrastructure
Post-Bid
Waynesboro, GA

Booster Pump & Water System Improvements
Results
$328,000 est. value
Georgetown, GA

Last Updated 05/02/2022 10:38 AM
Project Title

Trailer-Mounted Solids Handling Diesel Pump Skid

Physical Address View project details and contacts
City, State (County) Cornelia, GA 30531   (Habersham County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals to provide a 3,000 GPM at 500 feet TDH trailer-mounted solids handling diesel pump skid. The work to be completed shall consist of furnishing a 155 HP wastewater solids-handling trailer-mounted diesel powered pump skid to the City of Cornelia. The pump shall be able to pump 3,000 GPM at 500 feet TDH and have a sound attenuated enclosed trailer, 100 feet of both suction and discharge hose each with quick-connect fittings, a control panel, two (2) fifty (50) feet float cables, and a 175-gallon diesel tank or greater.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents