Similar Projects
South Valley Water Reclamation Facility's Project 5 Landscaping
Term Contract
Bidding
West Jordan, UT 84084

Downtown Data Center Landscape and Snow Removal Services
Term Contract
Bidding
Salt Lake City, UT 84101

Noxious Weed Treatment
Post-Bid
Ogden, UT 84403

Park Strip and Roundabout Landscaping
Post-Bid
Herriman, UT 84065

1100 East Curb and Gutter and 800 South 600 East Intersection Reconfiguration
Results
Less than $270,000 est. value
Salt Lake City, UT 84114

DFCM Construction - Dixie Technical College North Parking Lot, Fence and Landscape
Results
$677,437 est. value
Saint George, UT 84770

Mill Hollow Aspen Restoration Phase II
Term Contract
Bidding
Fruitland, UT 84027

Tree Planting - Fishlake NF (Utah)
Post-Bid
Richfield, UT 84701

Playground Wood Chips
Results
West Haven, UT 84401

Weeds Treatment-Ogden, Logan Ranger Districts-UWC National Forest
Term Contract
Bidding
Logan, Ogden, UT

Lawncare 29 Properties
Post-Bid
Salt Lake City, UT 84101

Stewart Lake Aerial Herbicide
Results
Jensen, UT 84035

2021 Fall Tree Installation Program
Term Contract
Bidding
West Jordan, UT 84088

Vegetation Control - Ground Pesticide Application
Term Contract
Post-Bid
Salt Lake City, UT 84114

Upper Otter Forest Restoration
Results
Randolph, UT

Last Updated 08/31/2021 04:43 PM
Project Title

New Canyon Ignition/Slash Lines

Physical Address View project details and contacts
City, State (County) UT   (Sanpete County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the FIRST slash line only the contractor shall slash all live and dead conifer trees within a 30-foot-wide swath (approximately 15 feet on each side of flagging lines) and pull back all of that material toward ignition line #2 15’ uphill to create a fire break of about 15’ wide without any downed woody material. This first slash and pull back line will be about 3 acres in size. Acreage is based on total length of the first ignition/slash line multiplied by the 30-foot cut swath.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents