Similar Projects
Door Access System
Alteration
Bidding
Pewaukee, WI

Immediate Need Fiber Projects
Post-Bid
Madison, WI 53703

2020 Fire Station Alerting System Installation
Post-Bid
Franklin, WI 53132

Door Control System Replacement
Results
Less than $135,000 est. value
Glendale, WI 53212

Fiber Optic Cabling at Bay Beach Wildlife Sanctuary
Results
Green Bay, WI 54302

Fall 2020 Fiber Builds
Post-Bid
Wausau, WI 54403

Oak 4K Learning Center Connection
Results
Green Bay, WI 54302

Commercial Internet Service for 115th Fighter Wing
Post-Bid
Madison, WI 53704

Administrative Counter Security Upgrades
Results
Green Bay, WI 54301

Architecture and Engineering Environmental Services for The United States Air Force (Ae Es 2020)
Post-Bid

2020 McDill Dam Monitoring and Control System
Results
Stevens Point, WI

Milwaukee Fire Life Safety CMc
Post-Bid
$8,000,000 to $10,000,000 est. value
Milwaukee, WI 53202

County Wide Communications System
Results
Eau Claire, WI

Integrated Electronic Security System (ESS)
Post-Bid
Madison, WI

Campus Fiber Optic Backbone Replacement - MEP
Results
Less than $650,000 est. value
Superior, WI 54880

Reported 06/16/2021 12:00 AM
Project Title

Tower Site Construction

Physical Address View project details and contacts
City, State (County) WI   (Jefferson County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Security/Communications, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope of work generally consists of the construction of (7) new radio communications site for Jefferson County, Wisconsin. The new sites include (6) existing towers and (1) water tower. Also included is (1) demolition only tower site. Work at the sites generally includes installation of prefabricated precast equipment shelters, backup generator systems, ice bridges, chain link fenced compounds, site grounding systems, and other general site improvements. The prefabricated precast equipment shelters have been previously procured by Jefferson County under a separate contract. However, shelter installation is required under this contract. In addition, one site will require a custom, site built, equipment shelter. See Summary Section 01 10 00 for detailed description of required Scope of Work

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents