Similar Projects
Kitchen Hood Cleaning Services
Term Contract
Post-Bid
GA

HVAC Services and Equipment Annual Contract
Term Contract
Post-Bid
Jonesboro, GA 30236

45--Provide Boiler Burner W/Installation. Remove Existing Defective Burner From #3 Boiler Supply And Install New Webster Natural Gas And #2 Fuel Oil Fired Burner, Model Hds5c-150B.
Results
Augusta, GA 30904

Replacement of Central HVAC System
Results
Lakeland, GA 31635

Cumming City Center Parking Deck HVAC Building K
Post-Bid
Cumming, GA

Jefferson Parkway Elementary School HVAC Renovations
Results
Less than $2,900,000 est. value
Newnan, GA

J072--Augusta Replacement of Ambulatory Care Chillers
Post-Bid
Augusta, GA 30904

HVAC Renovations Newnan Crossing Elementary School
Renovation
Results
Less than $4,300,000 est. value
Newnan, GA

Hoods and Ducts, Kitchen Exhaust Systems, Cleaning Services
Post-Bid
Warner Robins, GA 31098

Blacks Mill Elementary School-HVAC Replacement and Reroof
Results
Dawsonville, GA 30534

HVAC Filtration Systems Upgrades
Post-Bid
Austell, GA 30106

HVAC Renovations to Thomas Crossroads Elementary
Results
Less than $2,500,000 est. value
Sharpsburg, GA 30277

HVAC at Conference Center
Post-Bid
Forsyth, GA 31029

HVAC Renovations to Arnall Middle School
Results
Less than $4,500,000 est. value
Newnan, GA 30265

Fire Stations 5 and 10 HVAC Replacement
Post-Bid
Fayetteville, GA 30215

Last Updated 12/16/2021 09:57 AM
Project Title

Install New HVAC Equipment in ( 3 ) Elementary Schools

Physical Address View project details and contacts
City, State (County) Chatsworth, GA 30705   (Murray County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Winning bidder will be responsible for any and all clean up , both interior and exterior of the building . Winning bidder shall provide all necessary equipment & material during this process. This includes but is not limited to dust , debris , exterior landscapes ect. Wall patching methods will be Owner approved . Methods will need to match the existing building . Controls work is excluded in this contract . All existing DDC controls will be disconnected by a controls contractor prior to demolition .

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents