Similar Projects
RFQ Engineering - Greene Street Pump Station and Force Main
Infrastructure
Conception
$300,000 CJ est. value
Greenville, NC 27834

SCADA Building for the Old Tar Gate Station Site
New Construction, Infrastructure
Design
$300,000 CJ est. value
Greenville, NC 27858

Gymnasium and Special Needs Facility/Winterville - Pitt County
New Construction, Infrastructure - 56,000 SF
Design
$6,500,000 CJ est. value
Winterville, NC 28590

Wildwood Park Bridges and Boardwalks
Infrastructure
Bidding
$2,000,000 CJ est. value
Greenville, NC 27834

Frog Level Pump Station And Force Main Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Greenville, NC 27858

Guy Smith Stadium Improvements Phase I
Infrastructure
Sub-Bidding
$550,000 CJ est. value
Greenville, NC 27834

Forlines Pump Station and Force Main Improvements
New Construction, Infrastructure
Post-Bid
Greenville, NC 27858

Royal Farms #493 / Greenville
New Construction, Infrastructure - 5,200 SF
Post-Bid
$1,400,000 CJ est. value
Greenville, NC 27834

Southeast Service Area Sanitary Sewer Improvements
Infrastructure
Results
$6,298,238 CJ est. value
Greenville, NC 27858

Taxiway A North Rehabilitation
Infrastructure
Results
$3,927,793 CJ est. value
Greenville, NC 27834

Ridgewood Farms
New Construction, Infrastructure
Construction
$47,700,000 CJ est. value
Winterville, NC 28590

Dickinson Avenue Apartment Complex
New Construction, Infrastructure
Pending Verification
$57,000,000 CJ est. value
Greenville, NC 27834

Wastewater Tank - Greenville Utilities Commission
Demolition, New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Greenville, NC 27858

Gymnasium in the Alice F. Keene District Park - Pitt County
Addition, Infrastructure
Design
$3,700,000 CJ est. value
Greenville, NC 27858

Community Center and Gymnasium for Alice Keene District Park
New Construction, Infrastructure
Bidding
$2,900,000 CJ est. value
Greenville, NC 27858

Last Updated 09/05/2023 04:33 AM
Project Title

RFQ Contractor - Greenville Utilities Commission, Section 14 Streambank and Shoreline Erosion Protection Project

Physical Address View project details and contacts
City, State (County) Greenville, NC 27834   (Pitt County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected September 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

SOURCES SOUGHT NOTICE FOR Greenville Utilities Commission, Section 14 Streambank and Shoreline Erosion Protection Project This is a Sources Sought/Request for Information only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. The U.S. Army Corps of Engineers, Wilmington District, is seeking information regarding the capability and availability of qualified contractors to provide the Greenville Utilities Commission, Section 14 Emergency Streambank and Shoreline Erosion Protection Project. Government is requesting information from interested and capable sources for the purpose of identifying sources that can meet the Government's requirement and help determine how to issue the solicitation. The information provided must contain enough detail to demonstrate ability to meet the Government's requirement as described in the Project Information listed below. It is the intent of the Government to solicit and award as a firm fixed priced contract and will be procured in accordance with the FAR, DFARS, AFARS, and USACE Acquisition Instructions. The responses are for informational purposes only and do no obligate the Government or Contractor in any way. The work consists of the Greenville Utilities Commission Project is Cap 14 project located in the City of Greenville, North Carolina. The project is a streambank erosion stabilization project located on the banks of the Tar River at the Greenville water treatment plant. Advanced river bank erosion has degraded significantly after the existing Articulated Concrete Block protection failed and is effecting the operation and maintenance of the treatment plant's freshwater intake pipes. The project will construct a rip-rap channel bank and underwater revetment at a stable slope in order to prevent further erosion. The project site has a well maintained construction access road and plenty of room for staging onsite. The project is anticipated to take 4-6 months to construct. The magnitude of construction for this project will be between $1,000,000.00 and $5,000,000.00. All interested firms with 237990 as an approved NAICS code have until 15 September 2023 at 1100 AM to submit the following information: - Name & Address of your Firm - Point of Contact (Name/Phone/E-mail) - Current SAM Record to included DUNS Number and CAGE Code - Business size, to include designation as HUBZone, 8(a), Service Disabled Veteran Owned Small Business, Small Disadvantaged Business, Woman-Owned Business, and Large Business. Any supporting documentation that confirms your socio-economic status should be provided, i.e., letter of certification from VA confirming SDVOSB status. The Government must be able to verify SBA certification of HubZone and 8(a) via SAM. - Bonding capability - both single and aggregate capacity contracts, as evidenced by submission of Surety Company Letter stating bonding capacity. - Information on Teaming Arrangement (if applicable). Although we are not looking for formal signed agreements at this time, if you intend to "team" with another firm, formally or informally, you must submit information, not more, than one (1) page, about your team's involvement. More specifically, you must submit sufficient information for the Government to determine the roles each team member will play and what your socio-economic status is or will be considering the proposed arrangement. Therefore, included in your one (1) page if you are a Small Business and you intend to mentor/protege and/or JV with a large business both team members must sign. The Government may not give credit to your socio-economic class if there is not sufficient documentation to support it or if the Government cannot verify through other means that your business is as such. The requested information shall be submitted electronically to: U.S. Army Corps of Engineers Attn: Troy Small and Jenifer Garland E-mail: troy.d.small@usace.army.mil and jenifer.m.garland@usace.army.mil The email should be titled: CAP 14 - GUC Sources Sought Response Do not send hard copies of advertising or promotional materials. Please ensure that all responses are comprehensive and provide a name and point-of-contact for your firm for follow-up by this office or the procuring contracting officer. If you have responded to any previous e-mail messages or had other communications with our office regarding preliminary market research for this project, please be advised that it will be necessary for you to respond to this e-mail and the questions contained therein. Any responses involving teaming agreements should delineate between the work that will be accomplished by the Prime Contractor and work accomplished by the teaming partner All information is to be provided on a voluntary basis at no charge to the Government. There is no entitlement to payment of direct or indirect costs related to or arising out of responding to this request for information. All information provided becomes property of the Government. There is no guarantee, expressed or implied, that the market research for this acquisition will result in any guarantee of award or acquisition strategy. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Electrical Utilities, Communications Utilities.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents