Similar Projects
Relay Brick Walkway at Nesmith Library
Infrastructure
Bidding
Windham, NH 03087

Road Rehabilitation Phase 2 and Sidewalk Replacement
Infrastructure
Bidding
Keene, NH

Driveway Sealing and Striping
Post-Bid
Madison, NH 03849

Acquisition and Development of Pearl Street Parking Lot
Infrastructure
Post-Bid
Manchester, NH 03104

Whittier Street Sidewalk Improvements
Results
Dover, NH

Cheshire Rail Trail III Loop Project
Results
Less than $306,636 est. value
Keene, NH

Keene Housing Site Improvements - Multiple Locations
Renovation
Construction
Keene, NH

Acquisition and Development of Hartnett Parking Lot
Infrastructure
Post-Bid
Manchester, NH

Wason Pond Community Center Ramp
Results
Chester, NH 03036

New Hampshire Farm Museum Parking Lot
Alteration
Post-Bid
Milton, NH 03851

Walkway Treatment
Results
Boscawen, NH

Police Station Parking Lot Expansion
Infrastructure
Post-Bid
Lebanon, NH 03766

2021 Sidewalk Improvements
Term Contract
Results
Dover, NH

Development Partnership with the City of Portsmouth for the Federal McIntyre Property
New Construction - 107,000 SF
Post-Bid
Portsmouth, NH 03801

Central Street Parking Lot Project
Results
Franklin, NH 03235

Reported 04/07/2022 12:00 AM
Project Title

Granite Curb Services

Physical Address View project details and contacts
City, State (County) Salem, NH   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The trench for the granite curbing shall be mechanically excavated to a depth of 24 inches and a width of 18 inches. The finish grade of the vertical curbing shall be 7 inches above the final surface, unless directed otherwise. The trench shall be evenly graded, and additional gravel shall be placed if necessary to maintain a uniform depth and where existing materials are unsuitable. All voids shall be filled, and all high points or large stones removed. Curbing shall be laid on gravel pack with intermittent voids underneath to receive concrete backfill. Each piece of curbing shall be completely and evenly supported for the length of the stone. Adjacent stone shall match as close as possible to the previous stone and be set within 1/4 inch from the end. The alignment shall be approved by the Town prior to placement of concrete.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents