Similar Projects
N041--25 Ton Chiller Replacement
Post-Bid
North Chicago, IL

Connect B1 W Penthouse to Central Chiller Plant
Post-Bid
Marion, IL 62959

HVAC Equipment Replacement
Results
Evanston, IL 60201

Boiler Replacement at Indian Trail JHS
Renovation
Results
Addison, IL 60101

J041--Marion VA Medical Center Annual York Chiller Inspection and Preventive Maintenance
Post-Bid
Marion, IL

IVCC Building G AHU Replacement
Results
Oglesby, IL 61348

HVAC Inspection, Analysis & Preventative Maintenance
Term Contract
Post-Bid
Rockford, IL 61104

DOC-Sheridan-Outdoor Chiller for C3
Results
Sheridan, IL 60551

Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

2020 HVAC Replacement
Results
Wheeling, IL 60090

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

Hot Water Heater Replacement
Results
Rock Island, IL 61201

On Call HVAC Repair Services
Term Contract
Post-Bid
West Chicago, IL 60185

Shawnee Community College Emergency HVAC
Renovation
Results
$75,000 to $100,000 est. value
Ullin, IL 62992

Furnace Inspection & Cleaning at Various Sites
Term Contract
Post-Bid
Evanston, Wheeling, IL

Reported 07/21/2021 12:00 AM
Project Title

Heat Exchanger Replacement

Physical Address View project details and contacts
City, State (County) East Alton, IL 62024   (Madison County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials to replace the existing evaporative condensing unit and heat exchanger at East Alton Ice Arena. All bids should take into consideration and include the following: - Condensing unit sized to work with a possible Ammonia system in the future - Heat exchanger, taking waste heat and using for the sub-floor heating grid and snow melt pit - Sump tank - Removal of current condenser, exchanger, sump, etc - Evacuation system in place in the event that the valves do not hold - 8 hr change over; meaning all is set in place to then shut down the system as briefly as possible to ensure no ice is lost (include overtime & evening work).

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents