Similar Projects
Last Updated | 10/20/2022 11:07 PM |
Project Title | RFP - Consultant Services for Controls Conversion to DDC Automated Building Systems at Eight(8) Elementary Schools |
Physical Address | View project details and contacts |
City, State (County) | Wallingford, CT 06492 (New Haven County) |
Category(s) | Education |
Sub-Category(s) | Elementary School |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Clarification deadline 6/1/2022 5:00 PM The Town of Wallingford is seeking an engineering consultant or interdisciplinary team of architectural and/or engineering consultants to conduct investigative services, prepare and design drawings and specifications for bidding, provide cost estimates and provide construction administration services for conversion of all building controls, including existing pneumatic devices, to new electrical based direct digital control system at 8 elementary schools. AFFIRMATION OF BIDDER The undersigned bidder affirms and declares: 1) That this contract proposal is executed and signed by said bidder with full knowledge and acceptance of the provisions of the General terms & Conditions, Bid Specifications and Bid Proposal which are made a part of the contract. 2) That should any part of this proposal be accepted in writing by the Purchasing Agent within sixty (60) calendar days from the date of opening Part B of the bid, said bidder will furnish and deliver the commodities and/or services for which this proposal is made, in the quantities and at the prices bid, and in compliance with the Specifications. 3) That this proposal is covered by surety, in the amount stated above, in the following form. Bid surety is to be enclosed in Part B of the Bid Documents. Failure to do so may result in rejection of the bid. The method of contractor selection has not been determined at this time. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |