Similar Projects
Florence Columbus Road Warehouse
New Construction, Infrastructure - 1,000,000 SF
Conception
$40,000,000 CJ est. value
Fieldsboro, NJ 08505

Towneplace Suites by Marriott / Burlington
New Construction, Infrastructure
Design
$25,000,000 CJ est. value
Burlington Township, NJ 08016

South Church Street Senior Living Facility
New Construction, Infrastructure - 56,672 SF
Design
$4,000,000 CJ est. value
Mount Laurel, NJ 08054

Demolition of Three (3) Residential Building Structures and Barn
Demolition, Infrastructure
Bidding
$20,000 CJ est. value
Mount Laurel, NJ 08054

Sludge Tank Conversion Project REBID
Demolition, Renovation, Infrastructure
Bidding
$88,000 CJ est. value
Mount Holly, NJ 08060

RFQ Contractor - Construction Services Classroom Facilities
New Construction, Infrastructure - 9,500 SF
Post-Bid
$25,000,000 CJ est. value
Joint Base Mdl, NJ 08641

Well 6 Pressure Filter Media Replacement
Renovation, Infrastructure
Post-Bid
$196,000 CJ est. value
Willingboro, NJ 08046

Maintenance Pump Station Repair Contract Statewide - 2022
New Construction
Results
Less than $5,000,000 est. value

Curb Ramp Improvements, FY2021 Community Development Block Grant (CDBG) Grant
Infrastructure
Results
$41,010 CJ est. value
Chesterfield, NJ 08515

Removal of Underground Fuel Tanks and Surface Fueling Equipment
Infrastructure
Construction
$150,000 CJ est. value
Cinnaminson, NJ 08077

Logisti-Center (Office & Warehouse Facility) / Lumberton
New Construction, Infrastructure - 429,200 SF
Construction
$46,000,000 CJ est. value
Lumberton Twp, NJ 08048

Sammy's Express Car Wash
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Mount Laurel, NJ 08054

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

AutoZone #3649 / Medford
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Medford, NJ 08055

River's Edge Park Improvement Project
Infrastructure
Bidding
$600,000 CJ est. value
Florence, NJ 08518

Last Updated 09/27/2023 10:12 AM
Project Title

Hornberger Avenue Pump Station

Physical Address View project details and contacts
City, State (County) Florence Township, NJ 08554   (Burlington County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $1,351,900 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes the furnishing of all labor, material and equipment necessary or required to complete all work set forth in these Specifications and shown on the Plans. Work includes but is not limited to demolition, demolition of existing pump station building, testing for asbestos, removal of asbestos containing material (if required), site clearing, site improvements, bypass pumping, dewatering, soil erosion and sediment control, furnish and installation of new above ground mounted valve vault, submersible wastewater pumps, wet well, wet well lining, exhaust fan, trash basket and associated railing, hoist, valves, process piping, yard piping, pipe fittings, instrumentation, electrical equipment, control panels and wiring, manholes, chain link fencing, chain link gate, bollards, yard hydrant, bypass manhole, site light, and a diesel generator. All other bid securities will be returned within three days after awarding and signing of the contract and approval of the Contractor's Performance Bond, Saturdays, Sundays, and Holidays excepted. Bids must be made on the standard Proposal form in the manner designated therein and must be enclosed in a sealed envelope bearing the name and address of the bidder and the name of the project on the outside, addressed to the Township of Florence, and must be accompanied by Certified Check, Bid Bond or Cashier's Check drawn to the order of the Township of Florence for ten percent (10%) of the total amount bid, provided said security need not be more than $20,000.00. All bid guarantees shall be accompanied by an executed consent from an approved surety company, licensed to conduct business in the State of New Jersey, agreeing to furnish the required Performance and Maintenance Bond upon the award of contract. The signed Proposal forms and bid security must be delivered to the place and on or before the hour named above. The accepted bidder must sign the contract within ten (10) days after the Notice of Award or forfeit his bid security. Bid securities will be returned to all but the three apparent lowest responsible bidders. All other bid securities will be returned within three days after awarding and signing of the contract and approval of the Contractor's Performance Bond, Saturdays, Sundays, and Holidays excepted. The right is reserved to reject any or all Proposals, in whole or in part, or to make awards to such bidder or bidders who, in the judgment of the Township of Florence is the lowest responsible bidder and to waive such informalities as may be permitted by law.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents