Similar Projects
New EMS Station 97
New Construction - 4,000 SF
Construction
Humble, TX 77346

Maritime Expansion Fire Training Center
Term Contract
Construction
$1,100,000 est. value
La Porte, TX 77571

Midwest Police Station Restoration–Hurricane Harvey
Renovation
Post-Bid
$200,660 est. value
Houston, TX 77036

Eastex VFD Fire Stations Number 26 and Number 46 Renovations
Renovation
Post-Bid
Less than $3,750,000 est. value
TX

Fire Station No. 4 Renovation Project
Renovation
Results
Houston, TX 77007

South Central Police Station Interior Restoration - Hurricane Harvey
Results
$42,411 est. value
Houston, TX 77003

CMAR for the Public Safety Building
New Construction
Post-Bid
Less than $55,000,000 est. value
Baytown, TX 77521

New Fire Station 1
New Construction - 19,896 SF
Post-Bid
Less than $6,500,000 est. value
Houston, TX 77040

Aldine Fire Rescue Station No. 11
New Construction - 15,185 SF
Construction
Houston, TX 77032

New Channelview Fire Training Services Facility
New Construction - 5,508 SF
Post-Bid
Less than $1,250,000 est. value
Channelview, TX 77530

Village Fire Department Station Addition and Renovation
Renovation, Addition
Post-Bid
Less than $4,305,000 est. value
Hedwig Village, TX 77024

New Cypress Creek Fire Station Number 25
New Construction - 9,000 SF
Post-Bid
Less than $7,000,000 est. value
TX

The Renovation and Addition to Klein Fire Station Number 6
Renovation, Addition - 9,500 SF
Results
$3,000,000 to $3,500,000 est. value
Tomball, TX 77377

Harris County Emergency Services District No. 9 New Fire Station
New Construction
Construction
Houston, TX 77095

Construction of the Sheldon Community Fire and Rescue Fire Administration and Maintenance Facility
New Construction - 28,500 SF
Post-Bid
Less than $10,000,000 est. value
Houston, TX 77049

Reported 04/29/2020 12:00 AM
Project Title

New Fire Station No. 41

Physical Address View project details and contacts
City, State (County) Houston, TX 77073   (Harris County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project will consist of the construction of a single-story structure, approximately 11,769 square feet, which will house fire department personnel by providing office, living, sleeping, work, and vehicle storage areas. The address of the project is 2850 Farrell Road, Houston, Texas 77073.

Details

1 Fire/Police Station, 1 Story Above Grade, 11,769 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents