Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Sewer Rehabilitation
Infrastructure
Bidding
El Cerrito, CA

Sanitary Sewer Pipeline Rehabilitation on Gettysburg Street Between First and Fresno Streets
Infrastructure
Bidding
$742,000 est. value
Fresno, CA 93711

2018-2019 Sewer Replacement
Infrastructure
Post-Bid
$442,200 est. value
Modesto, CA

River Trunk Realignment Gravity System Project
Infrastructure
Post-Bid
$24,970,000 est. value
Modesto, CA

CIPP Fiberglass Pipe Lining
Infrastructure
Results
Sacramento, CA

Cast Iron Sewer Replacement FY 2020-2021 Package IV
Infrastructure
Results
$716,790 est. value
San Jose, CA

Kern River RD Toilet Site Work Project, Sequoia National Forest
Alteration
Design
$250,000 to $500,000 est. value
CA

Citywide Sewer Main Replacement and Re-lining
Infrastructure
Bidding
$2,700,000 est. value
Hemet, CA

As-Needed Sewer Cleaning and Inspection (Fy22)
Infrastructure
Post-Bid
$1,400,000 est. value
San Francisco, CA

Miscellaneous Sanitary Sewer Repairs FY 20-21 (Package III)
Infrastructure
Results
$700,001 to $800,000 est. value
San Jose, CA

2022 Sewer Improvements Project
Infrastructure
Bidding
$650,000 est. value
Auburn, CA

Water and Wastewater Treatment Chemicals
Term Contract
Post-Bid
Clovis, CA

Sanitary Sewer Rehabilitation (Sub-Basin 85-202)
Alteration
Results
$5,900,000 est. value
Oakland, CA

Last Updated 05/02/2022 03:09 AM
Project Title

North Trunk Line Rehabilitation Phase 4

Physical Address View project details and contacts
City, State (County) Santa Maria, CA   (Santa Barbara County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of rehabilitating 421 feet of 21 inch diameter and 4,277 feet of 24 inch diameter asbestos cement sewer line with UV cured in-place pipe (CIPP), sewage bypassing, pre rehab cleaning and video inspection, post rehab video inspection, chemical grouting joints prior to lining due to ground water intrusion, and asbestos abatement.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents